On the eve of the “double festival”, Chen Zhaokun led a team to the construction front line of the company to inspect the safety production

On September 19 and 20, Chen Zhaokun, general manager of Jiangsu port construction, led a team to inspect the work deployment before the “double festival” in Ganyu port area and Xuwei port area, accompanied by sun Ning, deputy general manager of the company, Shi Jianping and heads of relevant functional departments.

Finally, Chen Zhaokun praised the front-line staff for their overtime, hard work and dedication, and extended Mid Autumn Festival greetings to all staff.

Contributed by: Yu Eryue    Wang Lei    Xu Leizhu: editing    Fang..

Chen Zhaokun fully affirmed the work deployment of Ganyu port area and Xuwei port area during the “double festival”.

Lifting Clutches

He stressed that all projects under construction should be strictly on duty during the festival to ensure no construction without safety and environmental protection; All personnel of the GS division shall always keep a tight grip on safety, environmental protection and epidemic prevention, and make concerted efforts to grasp the project quality and progress; The connection scheme of caisson transportation and installation process of Ganyu berth 4-6 and the installation scheme of platform components of Xuwei fire station have been clarified, which should be promoted in an orderly manner as soon as possible and go all out to ensure the contract construction period; For the practical difficulties existing in Xuwei 48#-49# berth wharf project, the relevant departments of the company shall implement and solve them as soon as possible, increase the investment in personnel and equipment, and ensure the requirements of the construction unit for the node construction period.

     At the construction site, Chen Zhaokun and his party inspected the environmental protection and safety production at the construction site, and listened to the construction progress report of each project.