If the sewage of other communities is connected, it is bound to increase the sewage discharge of the community.
The author wants to say: no matter what the project is (unless it is emergency repair), you (the construction unit) have absolutely no right to forcibly break the off-road takeover and line in someone else’s community without authorization! Because, according to the provisions of relevant laws and regulations, even if your community wants to reconstruct relevant facilities, it needs to be approved by the owners’ meeting.
Some owners came to the site to stop the theory.
Occupying or damaging trees, green spaces and landscapes;…
(the following photo was taken when the owner defended his rights) the pavement damaged by the construction unit without authorization, and the inspection well is set up to connect to the sewage pipeline.
The owner parked the car at the inspection well excavated by the construction team without authorization.
As we all know, the sewage treatment (pump house) of each community is designed according to the discharge of the community.
If you need to break the road for construction, you need to inform all owners in advance and construct according to relevant regulations.
Fixing Socket Angular End Nail Plate
Many years ago, in order to solve the sewage discharge of “Junzhuan building” in the east of Haimen century guanghuayuan community, a construction unit went to Haimen century guanghuayuan community without authorization to dig inspection wells with excavators and prepare to connect the sewage of “Junzhuan building” to the sewage pipe of Haimen century guanghuayuan community.
(15) Unauthorized erection of wires and cables, unauthorized relocation of water supply and drainage, gas and other pipelines 。.
The construction unit directly ignored the continued excavation construction.
On the Mid Autumn Festival, someone entered Guanghua community without authorization to forcibly dig roads and erect cables On the morning of the Mid Autumn Festival in 2021, a construction unit (a Yang electric power) came to Haimen century guanghuayuan community to break the road and bury pipes and wiring, which seriously infringed on the rights and interests of all owners of the community.
With the strong opposition of some owners and the owners’ committee, The construction unit finally changed the construction scheme, and the public rights and interests of the owners of Haimen century guanghuayuan community were safeguarded.
I really don’t know who gave them the power? The author wants to say: no matter what the project is, you (the construction unit) have absolutely no right to break the road and line outside someone else’s community without authorization! If you want to rebuild your own community, you need to go through the vote of the owners’ meeting.
At that time, the owners’ committee of Haimen century Guanghua garden posted objections at the scene.
After the owner called the police, the police came to the scene.
A Yang electric power construction personnel directly ignored and continued to forcibly excavate and bury pipes and lines.
Article 51 of the regulations of Nantong Municipality on residential property management prohibits the following acts within the property management area (1) Illegally building buildings and structures, changing the appearance of the house without authorization; (2) damaging or changing the load-bearing structure and main structure of the house without authorization, changing the position of doors and windows without authorization, and storing articles under overload; (3) Changing rooms or balconies without waterproof requirements into bathrooms or kitchens, or changing bathrooms above the kitchens, bedrooms, living rooms and study of lower level residents; (4) occupying or excavating roads, sites and underground spaces without authorization.
An external line of a broken road and buried pipe in a residential area of Yang Electric Power Property staff and community owners and construction personnel should learn from each other and stop excavation.
Even when the sewage pump is working at full load, there will be sewage overflow, which will even lead to the paralysis of the whole sewage discharge system.