Closing time: September 24, 2021 – October 4, 2021.
Scaffolding Ringlock System Ledger End
Traffic management brigade of Dongsheng District Public Security Bureau September 24, 2021 source: issued by Dongsheng..
Please support and understand the inconvenience caused to the general public during the construction.
It is hoped that the majority of motor vehicle drivers can grasp the road condition information in time, actively cooperate, bypass in advance, and obey the command of on-site management personnel.
At that time, motor vehicles are prohibited from passing at the above two intersections, and the planned vehicles need to choose the road to bypass.
As for the half closed announcement of Wushen West Street (Yuanding road Tuanjie Road), due to the construction of heating pipe network of Wushen West Street connecting line in Dongsheng District, the intersection of Tuanjie road and Wushen West Street and the intersection of national highway 109 and Yuanding road need to be closed during the construction period.