Project construction daily report of civil construction area 06 of phase I project of Zhengzhou rail transit line 7

The project unit’s design quantity is completed on the daily plan date, the monthly plan date, the monthly completion proportion, and the wanghuzhai station (open excavation) is completed Bottom plate section 1200100% 11 negative third floor side wall section 10000 / 0 negative second floor middle plate section 10000 / 0 negative second floor side wall section 120000 / 11 negative first floor middle plate section 120000 / 11 negative first floor side wall section 12001100% 11 top plate section 1200200% 9 other matters: 100% of the top plate bottom formwork of section 10, 50% of the upper turnover beam reinforcement installation, 100% of the top plate bottom formwork of section 9, and 9 sections, accounting for 75% of the design section 12.

201 shield machine mobilization platform, 400 shield machine installation and dismantling platforms per time and other matters in the section between sunbazhai station and wanghuzhai station have been completed, and the assembly and commissioning of shield machine on the right line has been completed by 76%.

Completion of construction progress.

Project construction daily report of civil construction area 06 of phase I project of Zhengzhou rail transit line 7   Tuesday, October 5, 2021, weather: overcast to light rain, temperature 11 ~ 14 ℃.

20% of the excavation of the lower turnover beam at the west side is completed; 60% of the middle plate support of section 7 has been removed; 50% of the turnover beam formwork on the top plate of section 8 shall be removed; Installation of 45t gantry crane in wanghuzhai station: 30%; Shield machine mobilization in gusun section   200000% 1 shield machine installation, lifting and dismantling 400000% 1 other matters none_ 3、 Construction operation management personnel and equipment input No.

Flanged Wing Nut

I.

Day shift of shield construction team: 42 persons / meeting the construction needs 4 Safety production of working faces at various work sites of the project section 10 top plate reinforcement binding transfer node bottom plate west side turnover beam excavation section 9 top plate formwork installation v Tomorrow’s construction plan the project unit’s design quantity day plans to complete the excavation of 60% of the lower turnover beam on the west side of the bottom plate section 12011 on the third negative floor of wanghuzhai station, 100 on the second negative floor of the middle plate section 12011 on the second negative floor of the middle plate section 12011 on the first negative floor of the middle plate section 12011 on the first negative floor of the top plate section 1219, and other matters; 80% of the upper turnover beam reinforcement of the top plate of section 10 has been installed; 80% of the middle plate support of section 7 has been removed; 80% of the turnover beam formwork on the top plate of section 8 shall be removed; Installation of 45t gantry crane in wanghuzhai station is 35%.

Day shift of steel support installation and disassembly team: 8 persons, 2 sets of 75t truck cranes to meet the construction needs 5.

Day shift of dewatering construction team: 6 persons / meeting the construction needs 3.

completion of output value (10000 yuan) 1 planned completion date, per capita output value weekly planned completion date   Complete week    Proportion 13131.14923335% planned to be completed in February    Proportion quarterly plan quarterly cumulative completion proportion 41012530% 19691256.3%    Planned quarterly accumulative completion proportion in the third quarter annual completion proportion contract amount accumulative completion proportion 154431467295% 47965    twenty-one thousand three hundred and ninety-one     45% II.

6、 Cause analysis and measures taken for failure of today’s plan    None; 7、 Mobilization of equipment and materials today (1) material mobilization: no new mobilization materials; (2) Equipment mobilization: no new mobilization equipment; 8、 No memorabilia..

remarks on equipment input of construction personnel and management personnel of the project I wanghuzhai station (open excavation)___ 1 day shift of earthwork excavation team: 5 person night shift: 5 person day shift: 8 person night shift: 4 person grab 1 set 60 excavator 2 sets 135 excavator 1 set_ Meet construction needs_ 2.

Day shift of structural construction team: 67 persons, 2 sets of 25t truck cranes, 2 sets of reinforcement processing equipment to meet the construction needs 4.

The excavation of the lower turnover beam on the east side is completed by 100%, and the cushion pouring is completed.