The construction scheme is not well written? Put away the key points of this specification

Including construction preparation, labor plan, material plan, personnel arrangement, construction time, site layout and division of flow section, etc.

It is required to be scientific and guiding, highlight the word “group”, and make careful arrangements for the selection methods of human and material resources, time and space layout, etc..

  3.

➤ font, font size and line spacing: the line spacing is generally 1.5 times the line spacing.

  ➤ use less or no industry-specific words.

The various subheadings in the article should be eye-catching.

What is the difference between the construction organization design and the construction scheme? Let Tu Mujun touch it and help you distinguish them clearly.

The only way to solve this kind of mistake is to check it carefully many times.

Of course, page number is essential.

Typesetting style ➤ paper size: A4 paper is generally used.

If you don’t know, come and watch quickly.

1、 Key points of preparation of construction scheme 1.

Requirements for manuscript typesetting 1.

Today, Xiaobian sorted out the key points of standardizing the preparation of construction scheme for everyone.

  ➤ header and footer: the design of header and footer should reflect the content of this chapter.

④ The construction method, process flow, construction procedure and four new projects are introduced in detail.

Margin suggestion: 3.17cm on the left, 2.5cm on the top, bottom and right.

The commonly used Title levels and formats are shown in the following table: 2.

It is the analysis of a construction method in the unit project or divisional (subdivisional) project.

Generally, it is constructed in No.

Some functions and operators expressed by foreign abbreviations, such as trigonometric function sin, cos and other unit of measurement symbols, such as temperature scale CC, K, national and ministerial code, product model, parts and product brand, such as steel bar brand HRB, etc., foreign names, book titles, place names, organs and organizations and various abbreviations, are generally in regular font.

4 Song typeface.

The table serial number can be uniformly numbered in the whole document, or numbered according to chapter, chapter and section, such as Table 1-1 and table 2-3.

  ➤ pay attention to the writing method of physical units.

For example, “1999” does not write “1999” and “99”; “1995-1999” cannot write “1995-99”; “1990s” does not write “1990s”.

difference between construction organization design and construction scheme some technicians and constructors who have just arrived at the construction site may be confused about when to prepare the construction organization and when to prepare the construction scheme.

In the text description, if the front is Chinese numbers, use Chinese, and if the front is Arabic numbers, use English.

Each form must have a table name and a table serial number.

  ➤ different preparation purposes.

Try to use “concrete” instead of “concrete”.

A short horizontal line should be drawn.

The century, year, year, month, day and time are in Arabic numerals and all use their full names.

Manuscript requirements ➤ text: do not indiscriminately use nonstandard simplified words, self-made words, typos and traditional characters (such as “part” written as “another part”   “Circle” is written as “garden week”, etc.).

⑦ Safety, civilization and environmental protection measures ⑧ other matters 2 Main construction scheme construction survey scheme: 1) project overview 2) layout and survey of control points 3) setting out of axes and control lines 4) setting out procedures of axes and elevation points 5) various tolerance and quality assurance measures during construction 6) completion survey and deformation observation 7) survey review measures and rectification of data 8) organization and management of construction survey 9) instrument maintenance and use system 10 )Measurement management system    Earthwork construction scheme: 1) preparation basis 2) project overview 3) construction deployment 4) operation process 5) quality control 6) main management measures formwork construction scheme: 1) preparation basis 2) project overview 3) construction arrangement 4) construction preparation 5) main construction methods and measures 6) allowable deviation and inspection methods of formwork installation 7) precautions 8) formwork calculation 9) economic consumption of formwork Technical analysis reinforcement engineering construction scheme: 1) overview 2) overall construction arrangement 3) main construction methods 4) technical quality assurance measures 5) safety and fire protection measures 6) environmental protection and civilized construction measures concrete engineering construction scheme: 1) preparation basis 2) construction deployment 3) construction method 4) concrete transportation 5) quality requirements 6) common quality problems and prevention measures 7) seasonal construction 8) safety Measure 2.

The font size of the text in the table can be one size smaller than the text, and there is no punctuation at the end of the text in the table.

Such errors are the most easy to make, so they need to be checked and corrected many times.

The construction organization design is a strategic deployment of the project and a comprehensive programmatic document for the overall situation of the project.

Preparation contents of construction scheme generally speaking, the construction scheme prepared separately for a subdivisional project shall mainly include the following contents: ① preparation basis ② overview and construction conditions of subdivisional project, explain the specific conditions of subdivisional project, select the advantages and factors of this scheme and the operation conditions that should be met before the implementation of the scheme.

The text font size should not be too large, which makes people feel empty, nor too small, which makes everyone look hard.

It can be intuitively explained in the attached drawings and tables, and it is necessary to carry out design calculation.

This can give people a sense of change and relaxation.

Tips: click the “construction engineering class” above ↑ and pay attention to adding the construction scheme from the civil engineering network.

  ➤ the form should be placed close to the relevant text.

when using English letters, especially to express units, the capitalized ones, the lowercase ones, the superscript or subscript ones, and the italics ones.

The notes are written below the table.

For example, “per M” in the text should be written as “per square meter”, and “100 cubic meters” in the text should be written as “100m” ³ ”。 If the number is specific, it shall be expressed in Arabic; if the number is approximate, it shall be expressed in Chinese; such as “100m”, “tens of meters”   “Five or six kilometers”, etc.

Writing common problems prevention and control ➤ typing errors.

The symbols used in the whole article should be unified, and strive to avoid two identical concepts using the same symbol or the same concept using different symbols.

The table name shall be filled in the center, and the table serial number shall be written in the right corner of the table.

  ➤ foreign symbols: foreign letters representing pure numbers and scalars, generally written in italics.

If you want to use it, the full text should also be unified, all use “concrete” or all use “concrete”.

It is the technical and economic analysis of the labor, materials, machinery, cost and construction period consumed in the construction implementation process under the condition of reasonable organization, so as to strive to adopt new technologies, Select the optimal construction method, that is, the optimal scheme.

③ Overall construction arrangement.

In a construction scheme, try not to appear “concrete” and “concrete” at the same time III.

Generally, the commonly used Song typeface, imitation Song typeface, regular script and bold script should be selected.

When the data in the same column or row in the table is the same unit, the unit shall be expressed in the header.

  ➤ figures: statistics, various measurements (including fractions, multiples, percentages, approximations), chart numbers and other sequence numbers, generally in Arabic numerals.

  ➤ arrangement of chapters and sections: it is generally divided into multiple chapters.

The font of the same content should be consistent.

⑤ Quality standards; Clarify the specific basis and requirements of main control items, general items and allowable deviation items, and indicate the inspection tools and inspection methods.

When the data is temporarily unavailable, it shall be left blank; When data should not be filled in.

Formwork Cone

Readers often feel uncomfortable when they see such mistakes, and their impression of your whole scheme immediately decreases.

  ➤ levels within chapters: Generally speaking, chapters, chapters and sections should be centered.

The corresponding bits of the data in the table shall be aligned.

For example, kilometers are “km”, not “km” or “km”, and square meters are “m” ² ” Instead of “m2 or M2”, please refer to the national legal unit of measurement table for details.

For typing errors that are easy to occur in computer typing, we should strengthen the inspection to prevent omission.

The first page of each chapter (section) can be separated by the same or different color pages and marked with the name of the chapter (section).

⑥ Quality management points and control measures, analyze the key and difficult points of subdivisional works, and formulate targeted construction and control measures and finished product protection measures.