It is a key construction project of Wuhan city
.
” The reporter saw at the scene of Qingfeng interchange No
.
During the Spring Festival, 219 builders of the First Metallurgical Corporation of China are still fighting on the construction site of the second section of Wuhan Dawu expressway
.
In the box girder processing plant of the second bid section of Wuda expressway, the workers bound the steel bars
.
From New Year’s Eve to the seventh day of the first month, we plan to complete 30000 cubic meters of subgrade filling, 10000 cubic meters of silt removal, 20 pile foundations, 14 tie beam caps, 14 pier columns, 7 capping beams, 20 precast beams, 700 meters of construction road hardening, and the construction of No
.
The reporter of Changjiang Daily drove along the second bid section of Wuda expressway
.
However, as young builders, we should take the lead in responding to the call to give up our small family and look after everyone
.
2 Beam Yard, which can create an output value of about 15 million yuan
.
The man’s hometown is Hongan County, Huanggang City, Hubei Province, and the woman’s hometown is Luliang City, Shanxi Province
.
“We have specially formulated the Spring Festival menu to provide delicious meals for the left behind workers, so that they can also enjoy the taste of new year’s dinner on the construction site and feel the warmth of home.” It is understood that during the Spring Festival, the project Department of the First Metallurgical Corporation of China will pay overtime wages in accordance with national regulations, prepare new year’s dinner for employees and express sympathy to their families..
.
Along the way, there were busy builders on the working faces of Qingfeng interchange, guowangwan bridge, overpass Xinshi highway bridge and Xiaocaihu interchange, as well as construction sites such as steel processing yard and box girder processing yard
.
On the morning of February 16, the bridge erecting machine was being hoisted at the site to prepare for the erection of the first beam in the second bid section
.
It is understood that the Wuhan Hekou section of Wuhan Dawu Expressway starts from the end of the lower extension of Jiefang Avenue in Huangpi District of Wuhan city and ends at Hekou Town, Dawu County, Xiaogan City, with a total length of 89.5 km
.
In the processing plant, the workers are making box girders
.
12 specialties and multiple processes were promoted at the same time
.
Peng Wutan said: “it’s the first time for both of us to celebrate the new year in other places, and we miss our family very much
.
Xu Wenjun, the person in charge of the project construction, said that 52% of the bid section is viaduct, and the girder erection will begin after the bridge erecting machine is hoisted
.
“The second bid section, about 14 kilometers long, is located in Huangpi District.” Wu Congying, project manager of the second bid section of Wuda expressway of the First Metallurgical Corporation of China, said, “in order to ensure the goal of connecting the main line structure by the end of this year, there will be no work stoppage during the Spring Festival
.
At the construction site, the reporter met a couple who had just been married for more than a month — Peng Wutan and Xiao ting
.
It is of great significance to optimize the layout of Wuhan export expressway, expand the channel capacity in the north direction of Wuhan, and consolidate Wuhan City as the center of national comprehensive transportation hub This is of great significance
.
“To make a piece of beam, we need to go through binding, molding, pouring, curing and other processes, and then transport it to the site and assemble it with a bridge erecting machine.” Xu Wenjun said that up to now, the processing plant has produced 65 beams, and the first beam has been hoisted since the eighth day of the first month
.
After hearing that the project will not be shut down during the Spring Festival, they decided to stay at the construction site after discussion
.
0 platform that the construction personnel were lifting a bridge erecting machine, and not far away were rows of piers
.
” In the project department, the reporter saw that Spring Festival couplets and the word “Fu” were posted in the office and living areas, and red lanterns and Chinese knots were hung on the eaves and corridors, with a strong flavor of new year
.
They planned to go to Lvliang first, and then return to Hong’an to pay New Year’s greetings to the old man
.
They are two workers of No.1 Metallurgical Corporation of China
.
With thin steel wire in one hand and hook like tools in the other hand, the steel bar workers put on, hook up and screw up the steel bars
.