Kajima Construction: the design and construction general contracting mode and practice of Japanese Enterprises

But after several years of development, we also feel that great changes have taken place in China’s construction industry

.

The second way: call or add Mr

.

There are only 5 large Japanese construction companies with a turnover of 1 trillion yen

.

Next to the radio tower, we built a hospital

.

In Japan, there are pumps produced by first-class enterprises and third class enterprises

.

Take water pumps as an example

.

Although the prices are different, they are basically the same in terms of performance, except that the ones with good brands may sell more expensive

.

▌ 2

.

At present, China’s total GDP is nearly three times that of Japan, but the per capita GDP is only one fourth of Japan’s, so we should continue to work hard to surpass Japan’s per capita GDP as soon as possible

.

Now the competition in the industry is fierce, and the awareness of customers in all aspects has been improved, so good quality and safety construction are needed

.

In terms of personnel, there are more than 7000 people signing contracts with the head office, and there are more than 20000 people in the world

.

The turnover of our Kajima company this year may be the largest among Japanese construction enterprises, with about 130 billion yuan, similar to that of the Third Bureau of China Construction Co., Ltd., which just shared with us

.

How can a development company do a good job in building? We sent 5 or 6 people to the project site to guide the construction team from the aspects of quality, safety, environment, progress and drawings, and educate them according to the Japanese site management mode

.

It is an office building with a height of 173 meters and a building area of 100000 square meters

.

About the specific operation management, share some of our practices: – 3 – advantages and disadvantages of design and construction general contracting, the above is my sharing content, thank you! If the article is approved by you, I hope you can share it with “circle of friends” or click “watching” in the lower right corner to show encouragement

.

However, the good ones must be more expensive, and the bad ones must be more expensive The price will be lower

.

The current situation of some sites in China a few years ago is that site management is sometimes chaotic, which is roughly equivalent to the situation in Japan in the 1950s and 1960s

.

Here is a comparison between China and Japan from the macro perspective, and a brief introduction to the characteristics of Japanese construction industry

.

It is designed by a Japanese company and a local company in Jilin Province

.

Jiang’s wechat friends to ask for the notice in word format, fill in the receipt form and reply to Mr

.

Our company was founded in 1840 and existed in the Opium War

.

The first way of registration: add teacher Jiang’s wechat (wechat: 13141125831), send the company name, participant’s name, position and other information to teacher Jiang, and teacher Jiang will issue the registration notice after receiving the registration information

.

After we arrived at the scene, we taught them the work they needed to do one by one

.

In Japan, I think it’s very good that the staff do morning exercises every morning before leaving work

.

Whoever completes the project first wins, and other connecting work is not considered

.

For example, the decoration is very luxurious, but in fact, whether the walls are empty or not is unknown

.

–A dream of bridges.

.

All the five companies with more than 1 trillion yen are enterprises with a history of more than 100 years

.

Fifth, different cultural habits also affect social consciousness

.

When we entered the site in 2013, the situation was very chaotic

.

▌ 3

.

At that time, the on-site staff were not very clear about the specific work content of the day

.

Thank you

.

There is no problem for a Japanese construction company to survive for 200 or 300 years

.

In 2020, Japan’s construction investment will be more than RMB 400 billion

.

How much is 1 trillion yen? It’s about 60 or 70 billion yuan

.

As for the operation and management of the site, there are arrangements from the morning meeting, to the description of the daily work content, the communication between each other, and the regular engineering meeting, so I won’t go into details here

.

From the construction company itself, they also need to improve the construction capacity to achieve differentiation

.

But in China, there are all kinds of materials and prices, and you don’t know how to choose them

.

Therefore, the project may choose materials with slightly poor construction quality, which can cope with the past and meet the needs of society anyway

.

– 1 – about Kajima group ▌ 2

.

There are many construction companies in Japan, mainly small and medium-sized companies and professional companies, with a total of more than 480000 (China has nearly 100000 construction companies), and the employed population is about 5 million

.

For the workers on site, they can exercise their muscles and bones, which is very good for reducing safety accidents

.

Jiang 13141125831qq online consultation: 624805287 long press the QR code below to follow me, online consultation ﹣ I only know today that the reason why I wander is to get close to you

.

Fourth, the different cultural habits of China and Japan affect the way of thinking of construction, there is a step-by-step situation

.

Registration contact person: Mr

.

The real estate companies set up their own teams and do the general contracting

.

Third, the standard is very strict, but sometimes it can’t be reached, and there is the phenomenon of playing edge ball

.

This is a building in Changchun, which was built around 2018 and is known as the best office building in Changchun

.

Design and construction general contracting (1) mode (2) design quality assurance (3) construction quality assurance – 2 – practice sharing of Kajima

.

▌ 1

.

At that time, there were several reasons: first, China mainly pursued speed and quantity

.

Second, China pays more attention to superficial luxury

.

The construction period is three years

.

The projects just introduced by the general assembly have done very well

.

This is a project of the real estate development company

.

Jiang

.

Domestic companies are more and more aware of self-improvement and constantly learning excellent things

.

The domestic large-scale construction enterprises only do the main contracting companies, and the other equipment, decoration, mechanical and electrical sub contracting

.

Project management practice goes back to the previous project

.

Japanese construction companies in China today, I share the content mainly from the micro perspective

.

We took a picture in Tianjin

.

Therefore, there are situations in which only the present is considered and the future is not considered

.

I think the general contracting of real estate companies is a big problem in the domestic construction industry

.

It has some commercial facilities

.

Then we saw the building with cable-stayed braces straight through the hospital

.