According to the requirements of the construction scheme, the relevant sections will be closed for construction.
on October 7, 2021 to 2021 At 18:00 on October 20, 2014, it was closed for 24 hours.
Closed construction section 2: cross street of Xinqiao road to Tianhe Park bridgehead closed time: 8:00 on October 11, 2021 to 18:00 on October 20, 2021, closed for 24 hours.
At that time, no vehicle other than construction vehicles will be allowed to pass in the closed sections.
Closure mode: the intersection is completely closed.
During the closed construction, please drive around the east ring road.
Closed route: shizijiekou, Xinqiao road → bridge head of Tianhe Park.
During the closed construction, please drive around the east ring road.
According to the arrangement of the on-site meeting of the people’s Government of qixingguan district on October 5, 2021, Daxin bridge in qixingguan district (the section from the gate of Daxin bridge to the bridgehead of Tianhe Park) The flood drainage ditch waterlogging control project will be officially started at 8:00 a.m.
The specific conditions are notified as follows ↓↓↓↓ 1.
Closure mode: the section is completely closed.
on October 7, 2021.
Closed construction section I: from the gate of Daxin bridge to the cross street of Xinqiao road.
△ the above figure shows the advertising information.
Please drive in strict accordance with the above notices and on-site traffic signs and obey the command of the on-site traffic police.
Closure reason: the construction of the pipeline from the gate of daxinqiao city to the crossroads of Xinqiao road of daxinqiao flood drainage ditch waterlogging control project in qixingguan District, Bijie City needs.
After watching it, remember to light up the “praise” and yo ↓↓..
Closing time: 8:00 a.m.
Closed route: gate of Daxin Bridge City → cross street of Xinqiao Road 2.
Reason for closure: the construction of the pipeline from shizijiekou of Xinqiao road to the bridgehead of Tianhe Park of daxinqiao flood drainage ditch waterlogging control project in qixingguan District, Bijie City.
Please understand the inconvenience caused by the closed construction Source: cloud seven stars Editor: Ren Jiali Reviewed by: Qiu Jing Jian System: Yang tingbing director system: Zhu Guanglun more news emergency search! Check the flowers everywhere! Come to Bijie to punch in and clinch a deal of 310 million yuan! Bijie is too busy here.