Construction process of HVAC installation engineering

   order     Record II.

Click the bottom left corner“.

Plate Bolt Anchor

HVAC Engineering (I)    Vertical pipe support   (II)    Pipe horizontal support (III)    Installation of steam pipeline pressure reducing valve group and steam trap group   (IV)    Layout of refrigerator room   (V)    Practice of combined support in refrigerator room   (VI)    Pressure gauge, thermometer, pipeline rubber flexible joint (VII)    Compensator (VIII)    Compensator classification (IX)    Welding pipe connection style   (x)    Wooden support style   (XI)   Installation of horizontal water pump   (XII)   Horizontal installation of air duct   (XIII)   Installation of air duct through wall and floor   (XIV)   Angle steel flange and packing installation   (XV)   Air outlet installation   (XVI)   Installation of flexible short pipe of outdoor inlet and air duct   (XVII)   Fabrication of air duct components   (XVIII)   Fan coil installation   (XIX)   Installation process standard of suspended fan   (XX)   Installation process standard of floor type air conditioning unit and fan   (XXI)    Installation process standard of small exhaust fan   (XXII)    Installation process standard of axial flow fan   (XXIII)    identification   (XXIV)    Floor heating system   (XXV)    Radiator heating system   (XXVI)    Air duct insulation   (XXVII)    Installation of water pipe insulation and protective shell   (XXVIII)    Water pipe elbow insulation (XXIX)    Reducing pipe insulation   (xxx)   Valve insulation   (XXXI)    Rubber plastic insulation of pipeline   (XXXII)    1, pay attention to the public number reply: the electrical and mechanical library 2, data, technology group, consultation, add the official account below WeChat: the official account number collected resources are from the network, for the purpose of exchange learning, copyright belongs to the original author or enterprise, if there is infringement, please connect us delete.