1.
There are problems that the external exposed wire buckle processed by straight thread does not meet the process requirements, the concentricity of lap welding is not found, meat biting, the weld is not full, there are many bubbles, and the reserved reinforcement of stairs is unqualified; B.
Individual projects are close to the completion and closing stage, and the construction site cannot be effectively closed; 2.
Quality behavior standardization (1) there are problems that the date of authorization and commitment is omitted or the form specified by the provincial department is not used; (2) The duty performance rate of the project manager of individual engineering construction unit or the chief supervision engineer of the supervision unit is less than 80%.
In the regular supervision meeting, the director and project manager do not speak, and the director’s representative or civil engineering supervision project shall preside over the meeting; (3) A small number of management personnel or supervisors on the construction site did not perform the change procedures or did not file with the regulatory department, and there was a discrepancy between the person’s certificate and the certificate; (4) The approval of construction and supervision technical data is not strict and the signature and seal are incomplete.
In this inspection, the construction projects applying for municipal standardized demonstration sites were evaluated and reviewed, the standardized management of construction sites of construction projects in the city was evaluated, the implementation of the real name system of construction workers was inspected, the quality and safety management of construction projects was inspected, and the work of building energy conservation and green building was inspected, At the same time, continue to strengthen the epidemic prevention and control on the construction site, and urge all participating units to implement all measures for epidemic prevention and control on the construction site.
The implementation of the real name system for labor employment.
The project leaders of some enterprises do not pay attention to the real name system, and do not assign special personnel to supervise and manage the real name system.
After each project inspection, the inspection team will give feedback on site.
5.
The standing book of safety measures expenses of some projects is not standardized, and the relevant bills and vouchers are missing; 3.
A total of 82 housing construction projects and 7 municipal infrastructure projects were randomly inspected.
In some projects, attendance equipment was not installed on the construction site, the attendance rate on the construction site did not meet the standard requirements, and the information input of labor personnel was incomplete.
Nonstandard masonry leads to large gap at the top of infilled wall, deviation of tie bar or structural column joint bar position or unqualified planting bar quality, and the setting position of structural column reinforcement does not meet the specification requirements; D.
Due to the impact of the epidemic, this joint inspection only inspected the construction projects under construction in the urban area and Yongji County, and no inspection was carried out in other cities (counties).
The application of project quality and safety manual management platform has been preliminarily implemented.
Three inspection teams were organized for this major inspection.
There are some problems in the steel structure engineering, such as offset and rust of anchor bolts, eccentric opening of base plate, different overall dimensions, uneven roof horizontal tie bars, rust at the root of steel columns, falling of anti-corrosion paint, uneven thickness and so on, and electric arc injury of individual steel columns..
The overall implementation of epidemic prevention is good, but there are also problems of going through the motions, which are mainly reflected in: (1) project management.
Some projects still have material and equipment procurement and leasing contracts, social security certificates of project managers, labor contracts, payroll and other materials, which are not fully prepared, and the signing of professional subcontracts of some projects is not standardized; 3.
In this inspection, 71 feedback opinions were issued to relevant responsible units; 92 construction project rectification notices; 41 copies of safety supervision rectification notice within a time limit; 1 copy of safety supervision shutdown rectification notice.
The industrial project has the behavior of construction without construction permit.
Some projects are dangerous, and the acceptance of divisional and subdivisional works is not standardized, and acceptance signboards are not set in obvious positions as required to publicize the acceptance time and responsible personnel; 2.
We thank our peers for their continued support and help, so that so many peers can come together and gather talents for our construction industry.
2.
(2) In terms of civilized construction, 1.
The leaders of the quality supervision station, safety supervision station and construction market supervision detachment of the Municipal Bureau of housing and urban rural development serve as the group leaders respectively, and the quality supervision station, safety supervision station, construction market supervision detachment, energy conservation science and Technology Department, wall reform office and bulk office send personnel to participate.
This inspection adopts the double random supervision mode of purchasing services from social forces, hiring quality and safety experts and testing institutions, and adopts the working mode of “supervision cadres + experts” and the inspection mode of “four no and two direct”.
In order to better and more comprehensively serve the majority of peers, this subscription number is officially renamed “project construction collection”, and the main body and content remain unchanged.
Project quality standardization management (1) there are still some projects without sample guide or sample acceptance, and the samples of individual projects are inconsistent with the actual construction; (2) The quality control of some engineering entities is not strict: A.
All counties and districts conducted self-examination on the implementation of the real name system of labor employment.
The problems found in the first round of inspection this year have been rectified in time, but there are also some new problems, and there is still a certain gap from the standard management, It also needs to be further promoted in depth and breadth.
The cast-in-situ concrete has slag inclusion and other defects, the size deviation is too large, and there are no effective control measures for the position of reinforcement and the thickness of protective layer; C.
151 residential construction (sub) bureaus of counties (cities), districts and development zones, and the construction, survey, design, construction of houses under construction and municipal infrastructure projects in the city Supervision unit, project quality inspection organization and ready mixed concrete enterprise: in order to consolidate the achievements of standardized management of housing construction and municipal infrastructure engineering construction in our city, implement the requirements of the detailed rules for the implementation of construction project quality and safety manual, implement the requirements of construction safety, strengthen epidemic prevention on the construction site, and check the implementation of building energy conservation and green building, To further implement the main responsibilities of all parties involved in the construction of the project, our bureau will organize and carry out the joint inspection on the construction site management of the city’s construction in progress from August 16 to early September 2021.
(4) Quality management 1.
The emergency drills of some projects are not comprehensive and standardized, and generally only fire emergency drills; 4.
The responsible subjects of all parties are relatively standardized in the management of construction market, quality and safety behavior, the project management, quality and safety are under control, and the epidemic prevention measures on the construction site are well implemented.
The attendance rate of some project managers, chief supervision engineers and other management personnel does not meet the standard, and the attendance rate of labor personnel is too low.
The on-site management personnel of labor subcontracting units generally perform their duties poorly; 2.
The quality and safety management of the construction site has been steadily improved, but the management system is imperfect and the management measures are not implemented.
The dust control measures during the construction of landscaping construction, roads, pipe networks and other supporting works at the end of individual projects are not implemented in place; 3.
The vehicles driving out of the earthwork operation of individual projects are not cleaned, and the polluted road surface cannot be cleaned in time.
The safety technical disclosure of individual projects is not standardized, and there is a mixed phenomenon of special operators and ordinary workers.
In order to facilitate peer communication and resource sharing, we have established a wechat group of various disciplines and posts.
Welcome more colleagues to join our builders’ homes and real estate developers’ homes! (see the end of the article for the way to enter the group) source: Jilin Municipal Bureau of housing and urban rural development, Jilin Municipal Bureau of housing and urban rural development’s notice on the joint inspection of construction site management of construction projects in 2021, Jishi zhujianfa [2021] No.
All problems found have been ordered to be rectified by relevant responsible units within a time limit.
From the inspection, most of the inspected projects have carried out the standardized management of project construction in accordance with the requirements of the provincial department and the Municipal Bureau of housing and urban rural development.
(3) In terms of safety management, 1.
The project payment is not implemented in place (the project payment is not paid according to the contract and the project payment voucher is incomplete); 4.
The relevant information is hereby notified as follows: 1.
2、 The inspection found that most of the existing main problems have implemented the quality standardization management of the project construction site and achieved certain results.
Basic information.