The problematic parts are marked for repair.
03 the newly built wall shall be fully hung with grid cloth.
If the putty is too thick, it is easy to crack, so the more times of putty is not the better.
The flatness, perpendicularity and perpendicularity of internal and external corners are accepted.
Hotline: 13207528807 gypsum and putty are actually the wall and top surface.
If the putty is not completely dry, it will crack in the later stage.
Fixing Socket Waved End Nail Plate
08 after the acceptance of polishing putty, it shall be polished and leveled with sandpaper.
If it is done according to the requirements, not only the top surface of the wall will be flat and beautiful, but also the probability of wall cracking will be greatly reduced.
Your level is high, especially the internal corner of the top surface.
Therefore, my friends, it’s better to ask the workers to set out before construction.
The guiding rule and level are mainly used for acceptance.
05 times of putty putty is generally applied 2 ~ 3 times according to the situation.
01 setting out is required for Woodworking (gypsum board ceiling), and setting out should also be mentioned for gypsum putty construction.
Hang internal and external corner strips.
If the budget is sufficient, gypsum leveling can be done for the whole wall.
Statement: issued by putty mortar branch.
Suppose that the putty is applied twice, the first putty must be dry before the second putty can be applied, and the second putty must be dry before the emulsion paint can be applied.
If the putty is too thick, it is easy to crack.
07 acceptance after the putty construction is completed, the acceptance shall be carried out after it is completely dry, and the putty polishing and emulsion paint construction can be carried out only after it is qualified.
Hanging net sticker; d.
For the old wall, top surface and wired slot, the grid cloth can be hung at the slot.
Whether the wall and top surface are well done or not mainly depends on two processes: one is wall masonry, and the other is gypsum, putty and emulsion paint.
Gap filling gypsum; c.
04 if the perpendicularity and flatness of gypsum leveling wall are not very good, putty will be applied directly.
brush antirust paint; b.
After it is finished, you can’t see skewness and skewness with the naked eye.
The flatness and perpendicularity of cement mortar wall are often not so ideal.
It seems a little troublesome, but in fact, it’s easy for the workers to set out the line! 02 before the formal large-scale construction of cracks, trunking and holes, some work should be done in place: A.
From an economic point of view, local gypsum leveling can be adopted, which simply means filling and leveling wherever the low-lying area is.
Therefore, in case of poor perpendicularity and flatness of the wall, plaster (or special bottom leveling putty) shall be used to level the wall first, and then putty shall be applied.
The newly built wall shall be fully hung with glass fiber grid cloth, which can effectively reduce the cracking probability.
Many workers do it directly without setting out.
For wall masonry, we will mention later that there are also some requirements for gypsum putty leveling.
06 the putty must be completely dry before the next process can be carried out.
If putty is applied directly, some places will be very thick and some places will be thin, and the probability of cracking will be greatly increased.
The internal and external corners of the wall should be equipped with a level gauge.