On the 27th, the reporter learned from the traffic police brigade of the high tech Zone (new urban area) that in order to effectively alleviate the traffic flow pressure on the main roads after the increase of bad weather in winter, the traffic police department intensively combed the construction sections of motor vehicle lanes occupied by the area under its jurisdiction.
At 11:00 on October 27, at the northwest corner of the intersection of the Railway Bureau, the reporter saw that the fences that originally occupied the two East-West motorways had been withdrawn to the sidewalk, and the potholes and uneven roads had been preliminarily leveled after retreating.
Disclaimer: 1.
SH) was founded in Changzhou, Jiangsu Province in 1993 and is now headquartered in Shanghai.
Please pay attention to the passing vehicles to avoid the construction personnel and pedestrians passing through the temporary road, and pay attention to the driving safety.
After consultation with the construction party, at the beginning of November, the Railway Bureau intersection will resume two-way 8-lane traffic, and pedestrians will also take the pedestrian lane.
The police will negotiate with the construction party in time to remove the block and return the main channels of the main trunk road and secondary trunk road in advance as far as possible before the occurrence of severe weather in winter, so as to effectively improve the travel efficiency in winter.
Urumqi traffic police also remind the majority of drivers that at present, the road section at the intersection of the Railway Bureau has not completed the new paving of the road.
It is understood that the touch inspection of the construction section is still continuing.
Xincheng holdings is willing to work with the whole society to realize people’s more expectations and yearning for a happy life with the joint efforts of tens of millions of Xincheng people and the new town condensed by countless “us”.
Xincheng holding group (601155.
Xie Jianming, squadron leader of Altay road squadron of traffic police brigade of high tech Zone (new urban area), introduced that as the main intersection of business district, hospital and residence of high tech Zone (new urban area), the road enclosure construction, especially in the morning and evening peak hours, has a great impact on the traffic along the line.
At present, its total assets exceed 400 billion yuan.
In this regard, the traffic police department took the lead in coordinating with the construction party here to advance the construction period and return the road.
The article pictures come from the Internet and design or site pictures; 2.
Later, the section will be re covered and paved to restore the normal traffic level.
Due to editing needs, there is no inevitable connection between text and pictures, which is only for readers’ reference; 3.
In order to avoid the depression of the newly leveled road caused by excessive rolling of vehicles, the police set cone barrels on the leveled road surface to guide vehicles to bypass in advance.
Information source: the financial media of Urumqi evening news expects that in early November, due to the construction of the intersection of Henan Road and Beijing Road (hereinafter referred to as the intersection of Railway Bureau), the construction will be completed ahead of schedule, the enclosure will be removed, and people and vehicles will go their own way.
The group adheres to the steady development strategy, strives for progress in stability, continues to innovate, strives to achieve high-quality development and runs to the world’s top 500 with the development mode of “two wheel drive” of residential real estate and commercial real estate.
What we.
Apologize for graphic infringement in the hot sales.
Xie Jianming told reporters that at the beginning of November, the construction at the northwest corner of the intersection of the Railway Bureau was not only completed, and pedestrians did not need to borrow the motor vehicle lane for temporary passage.
After 28 years of rapid development, it has become a comprehensive real estate group covering residential and commercial real estate.
Delete Xincheng holding.
Vehicles will enter the waiting area in advance according to the signal light, so as to improve the green light time, Improve vehicle efficiency in the west to east direction.
The double frontage pavement of Wuyue Plaza shopping center of the Convention and Exhibition Center is about 60-80 m2, and phase IV of October is in hot sale! Last issue! Wuyue residence has a building area of about 98-280 ㎡ 5#8# heavy weight plus promotion of exhibition core · Su style garden residence is popular.
In 2021, Xincheng holdings will continue to consolidate various capabilities, continuously innovate products and services, create a happy life for customers, actively undertake social responsibilities, carry forward the national brand spirit and become an enterprise citizen in the new era.
In order to effectively improve the traffic efficiency of vehicles driving from the west to East Henan Road timber factory to Beijing Road, a waiting area will be built at the intersection from west to East.