First, thermal insulation and heating measures must be taken.
When the mold temperature is not lower than 5 ℃, frozen cement concrete epoxy floor paint cannot be used.
We must ensure that the indoor temperature is higher than 5 degrees Celsius and not lower than 2 degrees Celsius.
After the construction of epoxy floor paint is completed, air drying is a very important process.
We want to share every day, because the construction of epoxy floor has certain requirements for the environment, and one of the key requirements of construction is temperature.
The mixing amount shall not be less than 300kg to ensure the strength of cement, so as to effectively avoid sand and dust after the completion of ground construction.
During transportation, ensure that the cooling rate does not exceed 5%.
Early strength agent can be properly added to cement concrete, and the pumped cement concrete pipeline can also be wrapped with thermal insulation materials to prevent surface freezing, cement segregation, mortar loss, etc.
The epoxy floor paint shall also use heater and fire to improve the indoor temperature.
Recently, the weather began to drop sharply, and the construction of epoxy floor paint will become difficult.
It is recommended to use epoxy floor paint three days after construction, fix and dry after construction…
3.
The cement grade shall not be lower than 42.5.
2.
What should be paid attention to in epoxy floor construction when the temperature drops suddenly? 1.
The roof, surrounding walls, doors and windows of the epoxy floor construction site shall be installed on the epoxy floor to avoid wind blowing or rain and snow pouring.