Shenyang Metro Line 3 construction, pay attention to detour!

Please strictly obey the command of the on-site traffic police and pass in a civilized and law-abiding manner.

From October 29 to November 15 at Heping South Street station, the dewatering well and communication pipeline relocation project of Metro Line 3 and Pingnan Street station were mobilized for construction.

The construction period is 9 days in total and is divided into two phases.

It will occupy the sidewalk from Nanshi Primary School of Shayang road to the south of Yangchun garden, and install non motor vehicle guardrails under the curb; The construction time of communication pipeline relocation project is 22; 00 — next day 5; 00.

The public security traffic management department will organize special police forces to monitor the construction sections and surrounding sections.

From October 29 to November 10, Sanhao Street station, the power pipeline relocation project of Sanhao Street Station of Metro Line 3 will enter the construction site, which will occupy the lower stone motorway on the east side of Sanhao Street (Wenhua Road – west gate of hardware city); The second row of motorway on the south side of Wenhua Road (Jinke Hotel Nanhu theater), construction time 22; 00 — next day 5; 00.

Thread Swivel Eye

                                         Square square station from October 30 to November 8, the relocation project of Shujie road of square square square station of Metro Line 3 entered the construction site.

It is recommended that qualified citizens try to choose the way of remote detour or staggered peak travel to avoid the peak traffic.

Do not park the vehicles at the construction section and the surrounding bypass lines at will, so as not to affect the normal passage of other vehicles.

Lay steel plates and install deceleration belts during the day to ensure the normal passage of vehicles.

Do not intersperse left and right in the traffic flow, so as to avoid traffic accidents and greater impact on the passage of the road section.

Steel plates shall be laid and deceleration belts shall be installed during the day, and the construction shall be carried out in sections to ensure the normal passage of vehicles.

Shenyang public security traffic police suggested that during the construction period, the traffic pressure on the above construction roads and surrounding sections increased.

In case of minor traffic accident with obvious responsibility, both parties shall immediately leave the site after taking photos and obtaining evidence, move the accident vehicle to a place that does not hinder the passage, and then negotiate for settlement, so as to avoid traffic congestion and secondary accidents caused by vehicles staying on the site for a long time.

The dewatering well project will be constructed in the enclosure during the day.

Please wait patiently, keep the distance and pass in turn.

Two rows of two-way motor lanes and non motor lanes on both sides of the East and West pass normally, and isolation barriers between motor and non motor vehicles are installed.

Click “home in Liaoning” above for free! Shenyang traffic police announced that the following sections will be occupied during the construction of Shenyang Metro Line 3, reminding citizens to pay attention to the reasonable planning of travel routes in time ⬇️⬇️⬇️ From October 29 to November 6, the drainage pipeline relocation project of Lingkong Yijie station of Metro Line 3 entered the site for construction.

Phase I occupies a 6.5m wide and 14m long road in the East, uses two rows of motor lanes in the west to organize vehicle traffic, and installs isolation guardrails between motor vehicles and non motor vehicles; Phase II occupies a road with a width of 8 meters and a length of 14 meters in the middle of the road.

Source: Liaoning Daily · Beiguo client [recommended reading] emergency notice! Liaoning, suspended from now on! Click 「 below 」.

During the construction period, it will occupy the 2.5m wide non motorized Lane in the north of Nanwu Road (Ningbo Road – lane 185 of Nanwu Road), and the existing enclosure in the south of Nanwu Road (Ningbo Road – lane 185 of Nanwu Road) will be expanded by 20m to the south to ensure the passage of 2.5m wide non motorized lane and sidewalk in the north.