Control of rock flake paint on construction environment

construction is strictly prohibited when the temperature is lower than 5 ℃ and the wall temperature is higher than 40 ℃; ② Construction is not allowed when the air is humid and the humidity is greater than 85%.

Cast In Loop

Construction shall not be carried out 5 hours before and after rain…

① .

③ Construction shall not be carried out in strong wind.