[Huilongguan Street] construction impact announcement

Project site leader of the project Department of the road reconstruction project of erpozi West Road and longxingyuan Ring Road: Li Xiang Tel: 18612723945.

To the majority of residents, shop owners, schools and hospitals: in 2021, Huilongguan street back street alley environment refinement improvement project: erpozi West Road Project (starting from the west side of longxingyuan west area in the west to the South Gate of longxingyuan west area in the East, 770m long and 10m wide) and longxingyuan ring road project (it starts from Shangqiao intersection on the west side of Huilongguan bridge in the north, passes through the east gate of longxingyuan central district and the entrance of G6 auxiliary road along the west side of the bridge, with a length of 234 + 182 = 416m and a width of 6m); the estimated commencement time of the two projects is November 3 and the estimated construction time is 59 days (November 3 to December 31) During the construction period, the construction section is temporarily closed.

The noise impact on the residents caused by the noise generated by various equipment used in the project construction; 2.

Here, the construction unit deeply apologizes to you.

The travel impact on the residents caused by the passage of large vehicles during the construction; 3.

All vehicles and pedestrians should bypass the construction section during the construction period.

What do you bring about by the construction Please forgive us for the inconvenience.

Bolt Anchor

During the construction period, the following interference will be caused to the residents, shops and schools around the road: 1.

Add that there may be temporary road closures during the construction period, but try to ensure the travel of residents…