Article 7 construction enterprises shall be among the “three categories of personnel” In case of changes in the allocation, establishment of work safety management organization and other statutory work safety conditions, as well as changes in work safety conditions due to the upgrading and addition of construction qualification, it shall report to the work safety license issuance and management authority (hereinafter referred to as the issuance and management authority) Article 8 the issuing and management organ shall establish a dynamic supervision and inspection system for the safety production conditions of construction enterprises, and take the enterprises with weak safety production management and frequent accidents as the focus of supervision and inspection.
Tips: mechanical full-time safety production management personnel (Class C1) can be engaged in safety production management of hoisting machinery, earthwork machinery, piling machinery and so on; Civil engineering full-time safety production management personnel (class C2) can engage in safety production management work other than hoisting machinery, earthwork machinery, piling machinery and other safety production management work.
If the enterprise is found to reduce the work safety conditions on the construction site or have potential accidents, it shall immediately put forward rectification requirements; if the circumstances are serious, it shall order the project to stop construction and make rectification within a time limit.
About job types 1.
Article 4 Where a construction project is subject to general construction contracting, the general construction contracting enterprise shall subcontract the project to a professional contracting enterprise or labor subcontracting enterprise with a work safety license according to law, and strengthen the supervision and inspection of the work safety conditions of the subcontracting enterprise.
If they find that they do not meet the statutory safety production conditions, they shall immediately make rectification, and make self-inspection and rectification records.
In order to further strengthen the dynamic management of safety production license of construction enterprises, according to the Interim Measures for dynamic supervision of safety production license of construction enterprises issued by the Ministry of housing and urban rural development, dynamic assessment of safety production license of construction enterprises is frequently carried out.
Interim Measures for the dynamic supervision of work safety licenses of construction enterprises Article 1 in order to strengthen the dynamic supervision of work safety licenses of construction enterprises, promote construction enterprises to maintain and improve work safety conditions, control and reduce production safety accidents, in accordance with the regulations on work safety licenses, the regulations on the administration of work safety of construction projects and Regulations on the administration of work safety license for construction enterprises Article 2 when preparing prequalification documents and bidding documents, the construction unit or its entrusted project bidding agency shall clearly require the construction enterprise to provide work safety license, as well as the main person in charge of the enterprise, the person to be the project leader and full-time work safety management personnel (hereinafter referred to as “three types of personnel”) Article 3 when examining and Issuing the construction license, the competent construction department shall examine whether the determined construction enterprise has the production safety license and whether the production safety license is in the suspension period, and shall not issue the construction license if it has not obtained the production safety license and the production safety license is in the suspension period License.
Full time safety production management personnel: refers to the personnel engaged in safety production management in the enterprise, including the personnel of the enterprise safety production management organization and the personnel engaged in safety production management in the project.
After receiving the report from the engineering supervision unit, the owner shall order the construction enterprise to rectify immediately Article 6 construction enterprises shall strengthen the daily dynamic inspection of the safety production conditions of their own enterprises and contracted projects.
Project director of the construction enterprise (class B) 3.
The issuing and management organ shall, according to the supervision, the reports and complaints of the masses and the reports on the changes of the safety production conditions of enterprises, carry out relevant supervision and inspection Article 9 The competent construction departments of the municipal and county-level people’s governments or the construction safety supervision institutions entrusted by them shall be responsible for the daily work safety In the process of supervision and inspection, the work safety license of the construction enterprise undertaking the project shall be checked.
Article 10 in accordance with Article 9 of these measures, if the construction is ordered to stop under any of the following circumstances, the city The competent construction Department of the people’s government at the county level shall, within 15 days from the date of making the last decision to stop construction, report in writing to the issuing authority (the competent construction Department of the people’s government at the county level shall also report to the competent construction Department of the people’s Government at the district level; if the project contractor constructs across provinces, it shall report through the competent construction Department of the people’s government at the provincial level) Put forward the proposal to suspend the enterprise’s work safety license, and attach the facts of violations of laws and regulations of the enterprise and relevant engineering projects and relevant inquiry records or other evidence materials proving the reduction of work safety conditions.
Full time safety production management personnel of the construction enterprise (Class C1 and C2) main person in charge of the enterprise: refers to the leaders who have the decision-making power over the production and operation activities and safety production of the enterprise.
The safety management personnel of construction enterprises shall pass the examination of the competent department of housing and construction and obtain corresponding qualifications before taking up their posts.
(2) Within 12 months, the same enterprise is ordered to stop construction of three projects in the same city or county; £¨ Article 11 if the rectification of the project undertaken by the construction enterprise still fails to meet the requirements or refuses to stop work for rectification after being ordered to stop the construction, the issuance and management organ shall file a case within 5 working days after receiving the proposal to suspend the work safety license as stipulated in Article 10 of these measures, and give the enterprise a punishment of suspending the work safety license for 30 to 60 days according to the seriousness of the circumstances In case of general or above production safety accidents in the project, the competent construction Department of the people’s government at the city or county level where the project is located shall immediately report to the local issuing management authority in accordance with the accident reporting requirements.
The issuing management authority may directly review or entrust the local construction competent department to review the safety production conditions of the construction enterprise and its project..
It mainly assesses whether it meets the standards of safety production license, staffing, whether the safety management personnel / special operation personnel have obtained the assessment certificate, etc.
If the construction enterprise refuses to rectify, the engineering supervision unit shall report to the owner.
Article 5 the project supervision unit shall check the work safety license and If it is found that the certificate of “three categories of personnel” does not meet the requirements or the safety production conditions on the construction site are reduced, it shall be required to rectify immediately.
The safety management personnel of construction enterprises shall, according to relevant laws and regulations, promote and improve the management level of construction enterprises in order to strengthen the team construction of construction safety production management personnel.
In case of cross Provincial Construction of the project contractor, the competent construction department at the provincial level where the project is located shall notify the issuing management authority of the basic information of the accident in writing within 15 days from the date of the accident Article 13 after receiving the report or notification specified in Article 12 of these measures, the issuance and management organ shall immediately organize the investigation of relevant construction enterprises (including construction general contracting enterprises and subcontracting enterprises directly related to the accident) The safety production conditions shall be reviewed and completed within 20 days from the date of receiving the report or notification.
Main person in charge of the construction enterprise (Class A) 2.
(1) the same enterprise and the same project are ordered to stop construction twice within 12 months.
Project Leader: refers to the person who has obtained the corresponding registered practice qualification and is authorized by the legal representative of the enterprise to be responsible for the management of specific engineering projects.