The installation position of construction elevator shall depend on the site conditions and equipment conditions

4.

Because only the stress conditions during construction are considered in the frame design, the frame should be temporarily strengthened before the overall removal to improve the flexural strength of the joint.

The installation methods of construction elevator are as follows: 1.

The installation of columns on both sides shall be carried out alternately.

Install standard joints and install two standard joints (usually no more than 8 meters) for temporary fixing.

The elevator is dangerous in operation, so it should be avoided where people often walk on the construction site.

When installing the standard joint, please pay attention to the perpendicularity of the guide rail and avoid excessive broken line and clearance to avoid collision during operation.

If the construction site conditions permit, it can be assembled on the ground and then lifted as a whole to reduce high-altitude operation.

If it is found that the hole position is inappropriate, do not enlarge the hole at will, and do not use lead binding to prevent the joint from loosening and deformation.

always adheres to creating value for cooperative customers, industries and countries, and cooperates with XCMG group, Zoomlion, CSCEC technology, China railway construction, China Railway, country garden Evergrande and other 40 + state-owned enterprises, central enterprises and well-known enterprises have reached long-term strategic cooperation alliances, have a large number of infrastructure and real estate cooperation projects, and rank first in the industry with huge scale and qualification.

Professional knowledge of infrastructure engineering machinery < < knowledgeschool > > the installation position of construction elevator shall be determined according to the site conditions and equipment conditions.

3.

Tel: 400-166-0276 official website: http://www.jmsbei.com Address: room 2408, Banghua global Plaza, No.

The installation position of construction elevator shall be determined according to the site conditions and equipment conditions, and shall be as far away from the overhead line as possible and kept outside the specified safety distance.

  Previous knowledge   Ten basic work of building safety data management, climbing frame installation and promotion process, whole process teaching! Guangzhou Jinmai Technology Equipment Co., Ltd.

The size of the connecting bolt shall be selected according to the diameter of the hole.

2.

In 2019, it initiated the leasing service + financial drive + whole process agent operation mode, focusing on providing professional asset appreciation and wealth sharing services for high net worth customers; Self developed a comprehensive functional platform dedicated to intelligent manufacturing of infrastructure machinery and equipment + digital system + high-tech R & D, fully enabled lean service standards, specialized and fine services for customers, and contributed to the backbone of the national 14th five year plan and the economic construction of Guangdong, Hong Kong and Macao Bay area.

Adhering to the core values of “practical service, quality, service, innovation and sharing”, Guangzhou Jinmai Technology Equipment Co., Ltd.

5.

2.

1, Jinsui Road, Tianhe District, Guangzhou, Guangdong Province..

was founded for 10 years and headquartered in Zhujiang New Town, CBD, Guangzhou.

When using temporary wind rope, steel wire rope shall be used; Bolts shall be used when connecting nodes and supports rather than conductors.

Steel Chamfer

Fix the embedded bolts of the chassis and base on the chassis, fix the jack up platform on the chassis, and fix the hanging basket in the center of the base.