2 neighborhood of Haidian District (4 items including 200# staff dormitory and 203# staff dormitory) There are the following problems in epidemic prevention and control: first, the special plan for epidemic prevention and control prepared by the construction unit has not been submitted to the supervision unit for review, and the disposal measures for personnel entering the medium and high-risk areas in the plan do not meet the requirements; The emergency plan for sudden epidemic situation was not submitted to the supervision unit for review, and the project information and responsible personnel information were not reflected in the disposal flow chart of different situations in the plan.
Second, the 7# outer scaffold frame on the south side of the office building was not closed with a dense mesh safety net.
Third, the canteen did not keep samples of food.
Second, the 6# building’s roof parapet is 20cm high, and no protective railing is erected near the edge.
(II) other types of multi-functional land in plot F3 of plot dx00-0301-0145, No.
Second, the kitchen operation room is not provided with a mouse guard.
Fourth, the bed spacing of dormitory a-2-3 in the labor living area is less than 0.3m.
Fourth, the labor subcontracting construction unit has mobilized 94 construction personnel, and only one full-time safety officer is set on the site, which does not comply with relevant regulations.
Second, the daily temperature monitoring of management personnel is only once a day, which does not meet the requirements, and there is no daily temperature monitoring record of labor personnel from October 8 to October 20 during on-site inspection.
(V) the following problems exist in the epidemic prevention and control of lot 02 of phase III civil works of Beijing Metro Line 8 in Dongcheng District: first, the ventilation and disinfection records of office area and dormitory area are incomplete.
Second, there is a phenomenon of one box with multiple machines in the power tool switch box on the first floor of the 200# building.
Fourth, there is no special toilet in the emergency isolation room.
in the next step, all participating units of the above projects shall attach great importance to epidemic prevention and control and production safety, deeply analyze the causes of the problems, draw inferences from one instance, and comprehensively carry out problem rectification, self inspection and self correction..
Third, the bed spacing in the workers’ dormitory is less than 0.3m.
III.
(III) there are the following problems in the prevention and control of 18 epidemic situations such as 1 residential building in Fangshan District: first, the bed spacing in the workers’ dormitory is less than 0.3m.
There are the following problems in construction safety: first, only one coil of hose is set for the temporary fire hydrant on the third floor of the 200# building, and a fire extinguisher pressure gauge at the stairway on the third floor of the 200# building points to yellow to show overpressure.
In terms of construction safety, there are the following problems: first, the foundation pit of the project is 11m deep, the foundation pit has not been backfilled, and the first floor structure in the southwest of the 7# office building is close to the foundation pit, and no protective railing is set at the edge.
(VII) there are the following problems in epidemic prevention and control of bid section 2 of West Ring Road (Rongjing West Street – East Ring South Road) road reconstruction project in Beijing Economic and Technological Development Zone: first, the specific information of full-time drivers and special vehicles sent to fixed-point medical institutions in case of fever personnel is not specified in the emergency plan for epidemic prevention and control prepared by the construction unit.
3).
Third, only other garbage collection containers are set in the office area of the construction site, and no recyclable and harmful garbage collection containers are set; There is construction waste in the kitchen waste container of the dormitory on the construction site.
Second, some Chefs (key post personnel) did not reflect the nucleic acid detection records in the “Beijing health treasure”, which did not meet the requirements of the special plan for epidemic prevention and control.
Second, two chefs in the canteen did not wear masks during on-site inspection.
The relevant information is hereby reported as follows: I.
There are the following problems in construction safety: first, the PE line from the two circuits of the distribution box on the 5th floor of 6# residential building is not connected with the PE line terminal board.
During the on-site inspection, there are no personnel in the dormitory, but the air conditioner is in the heating operation state.
There are the following problems in construction safety: first, combustibles are stacked around the project 2# residential building and are not cleaned in time.
Solid Lifting Socket Cross Pin
1, North District, Daxing Development Zone (7 items including 3# office buildings and 3 items including 1# office buildings) There are the following problems in epidemic prevention and control: first, the epidemic prevention and control work plan and infectious disease emergency plan prepared by the construction unit have not been modified in accordance with the notice on printing and distributing the epidemic prevention and control work plan on project construction site (reference template) (Jing Jian Fa [2021] No.
239 cases are proposed to be transferred for the hidden dangers of construction safety accidents found in the inspection.
Third, one full-time safety officer of the labor subcontracting construction unit changed the employed enterprise, and the newly employed enterprise did not apply to the assessment authority for certificate change procedures.
The city’s district housing and urban rural development committees also further strengthened supervision and law enforcement, strengthened the inspection of epidemic prevention and control measures, conducted a full coverage law enforcement inspection on the supervised projects within their jurisdiction every seven days, and urged all parties involved in the construction to implement their main responsibilities.
Fifth, the supervision unit did not review the electrician special operation certificate of the elevator construction unit.
Second, there is a management dormitory in the office area, and the bed spacing is less than 0.3m.
overall situation of on-site inspection since the special inspection on epidemic prevention and control was carried out, from January 1 to October 31, 2021, the municipal housing and Urban Rural Development Commission has dispatched 1560 inspection teams, 4933 inspectors, spot checked 2698 housing construction municipal and rail transit projects, and found 3494 problems in the inspected projects, There are 2187 epidemic problems and 1307 safety problems.
Second, some personnel at the construction site eat in the form of takeout without asking for tickets and certificates.
(IV) there are the following problems in the epidemic prevention and control of 5# residential buildings and 6# residential buildings in Yanqing District: first, the epidemic prevention and control work plan and infectious disease emergency plan prepared by the construction unit are not modified in accordance with the notice on printing and distributing the epidemic prevention and control work plan (reference template) at the project construction site (JJF [2021] No.
II.
The municipal housing and Urban Rural Development Commission has fed back the problems found to the district housing and Urban Rural Development Commission and urged the construction unit to make serious rectification.
Notice of Beijing Municipal Commission of housing and urban rural development on violations of seven projects such as the construction project of erjiefang dormitory building in Haidian District all construction, construction and supervision units and relevant units: Recently, there have been related and locally confirmed cases outside Beijing in our city, with high mobility of personnel in the housing construction system and high labor intensity, “external defense input and internal defense rebound” The double pressure continues to increase.
In order to further strengthen the epidemic prevention and control on the construction site, press and compact the “four responsibilities”, urge all participating units to implement the “ten strictness” requirements for epidemic prevention and control on the construction site, and in accordance with the decision-making and deployment of the municipal Party committee and municipal government on epidemic prevention and control, the urban housing and Urban Rural Development Commission highlighted six “further” and focused on the implementation of “four early” on the basis of the original epidemic prevention and control measures, The epidemic prevention and control work at the construction site of the city’s construction projects shall be carried out strictly, tightly and quickly.
Third, the 1m line at the dining room is seriously worn and unclear.
Fourth, the 6# building’s hanging basket under operation was not provided with safety isolation area and warning signs.
Second, the general distribution box of the project 1# residential building is set in the basement room with poor ventilation conditions, and only two fire extinguishers are equipped, which does not meet the requirements.
Second, the construction general contractor did not uniformly manage the accommodation of the labor personnel of the labor subcontractor Beijing Tengyu Shengtai construction labor Co., Ltd.
(VI) there are the following problems in epidemic prevention and control of v-01 and V-02 multi-functional land projects in canal core area of Tongzhou District (13 items such as C centralized commercial building): first, the updated epidemic prevention and control work plan prepared by the construction unit has not been approved according to the specified procedures.
Third, the ventilation situation was not recorded in the ventilation and disinfection record of the kitchen in the canteen of labor workers on October 15.
3).
The third is 6# the suspended basket of the building, which stays in the air and is not put on the ground.
Main problems found in random inspection (I) construction project of dormitory building in No.