The construction period is nearly one year! Zhongshan Road section will be closed for construction

At the initial stage of traffic diversion, the construction unit will send additional special personnel to conduct traffic diversion or guidance for passing vehicles and personnel.

Shuttering Magnet

Click above   Quickly pay attention to Zhongshan hometown circle   According to the traffic control notice, due to the construction needs of the reconstruction project of Tongxing intersection in ancient town of Qijiang highway on line S268 of Zhongshan provincial highway, it is planned to carry out closed construction on Tongxing road in ancient town and the north-south direction of the open road section from November 10, 2021 to November 4, 2022.

In case of infringement, please contact us and click below.

Guzhen branch of Zhongshan Public Security Bureau on November 8, 2021 road closure map of main road sections editor: Wang Jia second instance: LAN Yunliang third instance: Cheng Mingsheng material source: dengdu Guzhen Disclaimer: copyright belongs to the original author.

At the same time, it is also hoped that passing vehicles will strictly follow the on-site traffic signs or choose detours in advance.

The specific dredging scheme is as follows: vehicles from Tongxing road to Tongxing south road can only turn left to Huaan East Road → Tongyu West Road → shagu highway → Gushen highway auxiliary road and can change direction at Huating road to Jiangmen direction and Shiqi direction of Zhongshan City.

Please understand the inconvenience! It is hereby notified.