Apricot altar to Leliu attention! This section is closed for construction! Until October 2023!

During the construction period, three motor lanes + one non motor lane are guaranteed on both sides of the enclosure section, and the traffic mode at the intersection of Zhenghe South Road and Longzhou highway remains unchanged.

Due to the large number of transit vehicles in this section, let’s hurry to see how to bypass it!   ① Phase I: control measures from December 1, 2021 to February 28, 2022     The trunk road of g325 National Highway (Bai’an highway) is closed for construction.

During this period, three motor lanes and one non motor lane are maintained in both directions; The intersection of Longzhou highway and Zhenghe South Road will be closed, the traffic lights will be cancelled in the East and West, and two U-turn positions will be set on Bai’an highway and Longzhou highway.

Please understand the inconvenience caused by the construction! When you meet Xingtan, long press to identify the QR code..

The construction period is expected to be October 31, 2023.

Kindly remind that the passing vehicles should actively cooperate with the command and guidance of the current duty personnel, pass according to the instructions of the signs and markings on the construction site, and try to avoid the construction section.

Please pay attention.

  ② Phase II: control measures from March 1, 2022 to May 31, 2023       On the basis of the original enclosure, it extends eastward to the North intersection of Longsheng.

Fixing Socket Angular End

Detour route       ■    Vehicles from G105 national highway, Daliang to Zhenghe South Road and leliang Road (East to South) shall bypass in the following ways: G105 national highway, Daliang → Dawan overpass → north auxiliary road of Longzhou highway → north auxiliary road of Bai’an highway → Baizhang bridge (small and medium-sized vehicles) or Bai’an North Road (large vehicles) → South auxiliary road of Bai’an highway → Zhenghe South Road → Zhongcheng road → leliang road    ■    Vehicles from leliang Road, Zhenghe South Road to Longjiang (south to North) shall bypass in the following ways:    Route 1: Zhenghe South Road → South Lane of Longzhou highway → Dawan interchange or Shunde interchange turning around → North Lane of Longzhou highway → Longzhou road → Longjiang   Route 2: leliang road → turn left at Dawan interchange → North Lane of Longzhou highway → Longzhou road → Longjiang ■    Vehicles from leliang Road, Zhenghe South Road to Xingtan (south to West) shall bypass in the following ways:    Route 1: Zhenghe South Road → South Lane of Longzhou highway → Dawan interchange or Shunde interchange turning around → North Lane of Longzhou highway → Baizhang bridge → Xingtan   Route 2: leliang road → turn left at Dawan interchange → North Lane of Longzhou highway → North Lane of Bai’an highway → Baizhang bridge → Xingtan   ■    For vehicles from Xingtan to Longjiang (northwest), please detour as follows:   Xingtan → Baizhang bridge → South Lane of Bai’an highway → South Lane of Longzhou highway → Dawan interchange or Shunde interchange turn around → Longzhou road → Longjiang River   ■    For vehicles from longjiang to G105 national highway and Daliang (north to East), please detour as follows:    Longjiang → Longzhou road or → North Lane of Bai’an highway → Baizhang bridge (medium and small vehicles) or Bai’an North Road (large vehicles) turn around → South Lane of Bai’an highway → South Lane of Longzhou highway → Dawan overpass → National Highway G105 and Daliang   ■    Vehicles from longjiang to Zhenghe South Road and leliang Road (north to South) shall bypass in the following way: Line 1: Longjiang → Longzhou road → North Lane of Bai’an highway → Baizhang bridge (small and medium-sized vehicles) or Bai’an North Road (large vehicles) → South Lane of Bai’an highway → Zhenghe South Road Line 2: Longzhou road → Yincheng Road → Jianshe middle road → leliang road   ③ Phase III: control measures from June 1, 2023 to October 31, 2023       In the third stage, the main tunnel has been opened to traffic.

At that time, the traffic police department will announce the detour scheme.

Important news! Due to the construction needs of the underpass tunnel of the rapid reconstruction project (Zhenghe road node) of Leliu section of Longzhou Road, Shunde District, the construction unit will implement phased enclosure construction for this section from December 1, 2021.

The end of the enclosure is 130m away from the intersection of Zhenghe road and Longzhou highway, and the end is 180m away from Baizhang bridge.

The construction unit will construct the auxiliary road in four directions at the ground intersection of Longzhou road and Zhenghe South Road in sections.