The section from the starting point to Beijing Shanghai expressway is two-way six lane, and other sections are two-way four lane.
There are 7 stations along the line, including qufunan, Yanzhou North, Jining north, Jiaxiang north, Juye north, Heze East and zhuangzhai.
The opening and operation will end the history of no high-speed rail in Heze, effectively meet the needs of people in Southwest Shandong for high-quality travel, and provide solid road network support for promoting the major national strategy of ecological protection and high-quality development in the Yellow River Basin.
After completion and opening to traffic, it will be interconnected with the two passenger transport channels of Beijing Shanghai high-speed railway and Beijing Hong Kong (Taiwan) channel under construction, as well as National Trunk Railways such as Qufu Rizhao section of Rilan high-speed railway, Qinghai Salt railway and Zheng Xu high-speed railway.
At 14:06 on November 26, 2019, train g5572 slowly entered Rizhao west station, marking the opening of riqu section of Rilan high speed railway.
The main line adopts the expressway standard, and the design speed is 120 km / h.
Figure 2// At the launching ceremony of linteng highway, as the “Lian Liu” line in the “nine vertical, five horizontal, one ring, seven shooting and multiple connections” expressway network planning in the medium and long term development plan of Shandong comprehensive transportation network (2018-2035), the project will become a new East-West Expressway between Rilan Expressway and LAN Cao expressway after completion, It also has the functions of high-speed channel encryption and diversion and serving local economic trunk lines.
It is connected with Zheng (Zhou) Xu (Zhou) high-speed railway, with a total length of 494 kilometers.
There are 8 stations in the whole line, including Rizhao West, lijiazhai, Ju north-south, Linyi north, Fei County North, Mengshan, Sishui South and Qufu East, with an initial operating speed of 300 kilometers per hour.
Qufu Heze provincial boundary section is expected to be opened to traffic at the end of the year.
It takes only 29 minutes from Rizhao West to Linyi north, 1 hour and 14 minutes from Qufu East, 1 hour and 46 minutes from Tai’an, 2 hours and 14 minutes from Jinan, and only 2 hours and 6 minutes from g5565 evening train to Jinan west.
Li Xianrong, director of Linyi Transportation Bureau, Lei Yanjun, director and Ren Mingli, deputy director of Linyi highway development center, Meng Qingjun, a second-class researcher of Zaozhuang Transportation Bureau, Xu Qingjun, chairman of Shandong Expressway Construction Management Group, Hou Fujin, general manager, and leaders in charge of counties and districts along the project and main heads of transportation and highway departments attended the event.
The official operation test of the Qufu Heze zhuangzhai section of the Japan Lanzhou high speed railway means that the whole line of the Shandong section of the Japan Lanzhou high speed railway has entered the countdown ↓↓ after the opening and operation of the Shandong section of the Japan Lanzhou high speed railway, it will end the history of no high-speed railway in Heze and effectively meet the needs of people in Southwest Shandong for beautiful travel and life, Provide solid road network support for promoting the ecological protection and high-quality development strategy of the Yellow River Basin…
Riqu section of Rilan high speed railway is 235 km long with a design speed of 350 km per hour.
The estimated total investment is about 20.96 billion yuan.
Figure 1 // Launching activities of linteng highway construction The total length of Linyi Tengzhou expressway is about 141.3km, of which the length of Linyi section is about 104.9km, passing through 4 counties and 12 towns of Hedong District, Lanshan District, Fei County and Pingyi County of Linyi city.
After the completion and opening of the Nippon Lanzhou high-speed railway, the distance from Rizhao to Lankao will be shortened from 1100 kilometers bypassing Qingdao, Jinan and Xuzhou to less than 500 kilometers.
The test section of Qufu Heze provincial boundary of Rilan high-speed railway is about 205 kilometers away from Jining and Heze cities.
The opening and operation of riqu section of Rilan high-speed railway forms a high-speed rail ring passenger channel in Shandong Province with Beijing Shanghai high-speed railway, Jinan Qingdao high-speed railway and Qingdao salt railway, connecting Jinan, Zibo, Weifang, Qingdao, Rizhao, Linyi, Jining, Tai’an and other cities.
It only takes more than six hours to travel around Qilu.
The project is of great significance to optimize the layout of expressway network in Shandong Province, give full play to the overall benefits of the network, improve regional transportation conditions, alleviate the traffic pressure of existing sections, and serve the construction of Yimeng old revolutionary base.
It is not only a large high-speed railway channel connecting Shandong to central China, but also an important channel for Southern Shandong to enter central China, Beijing, Shanghai and Guangzhou.
Project dynamics on November 30, the construction start-up activity of Linyi Tengzhou expressway project was held in Linyi.
Qufu Heze zhuangzhai section of Rilan (Southern Shandong) high-speed railway is an important connecting channel of the national “eight vertical and eight horizontal” high-speed railway network and an important part of the “three horizontal and five vertical” high-speed railway network in Shandong Province.
Japan Lanzhou high-speed railway starts from Rizhao City, Shandong Province in the East and ends at Lankao County, Henan Province in the West.
Recently, with the successful departure of 55301 test train from Qufu south station, the Qufu Heze zhuangzhai section of Rilan high-speed railway officially began to operate.