Due to the large traffic flow and potential accidents in this section, it has been approved by the traffic police detachment of Bengbu Public Security Bureau, Municipal Transportation Bureau and other relevant departments, Add two-way traffic lights on the main road, sidewalk traffic lights, sidewalk zebra crossing and relevant traffic facilities at the intersection.
It is hereby announced! Traffic police detachment of Bengbu Public Security Bureau Bengbu Huaishang Traffic Construction Investment Co., Ltd.
Please drive slowly and carefully.
Road construction announcement S313 (original S306) pingjiaokou (120m east of Huilong group) optimizes the engineering transformation requirements, and it is proposed to carry out semi closed construction for the following sections: (screenshot) the construction scope is 120m east of Huilong group in S313 [original 306] of Huaishang district.
Construction date: December 5, 2021 – January 11, 2022 precautions: vehicles and pedestrians are not allowed to enter the construction site (construction enclosure).
Please understand and support the inconvenience caused by the project construction to the production and life of units, residents and pedestrians along the line, and pay attention to safety.
In order to ensure safe construction, conical barrels and fences need to be set in some sections [the closed range is 3m to the south of the central green belt of the intersection, 150m to the East and 150m to the West].
November 28, 2021..
Anhui Weishi road and Bridge Engineering Co., Ltd.