Emergency plan for mechanical pipe jacking construction – special construction scheme

Emergency preparation ^ 1) establish an emergency rescue team ^ team leader: XX deputy team leader: XX team members: XXX, XXX, XXX rescue team: Company rescue team and on-site construction workers ^ 2) responsibilities of personnel of emergency rescue team leader: be responsible for overall management and coordination, startup and implementation of emergency plan of the project, division of labor of team members Ask the superior unit for instructions and start the emergency plan of the superior department.

Technical reserve and guarantee 194.

in case of serious injury, the rescue team shall timely provide drugs required for rescue and use existing medical facilities to rescue the wounded.

3) .

project overview 1 II.

Ring Clutch

Safeguard measures 181.

The team leader and members shall quickly perform their duties, timely organize the implementation of the corresponding accident emergency rescue plan, and report the accident rescue situation to the superior at any time.

According to the analysis of the nature and consequences of potential accidents, emergency resources shall be equipped, including rescue machinery and equipment, means of transportation, materials, life support materials, etc..

5) Accident report: after a major safety accident occurs, the accident unit or party must report the situation of the major safety accident to the relevant accident supervision department: ① the unit, time, place and location of the accident; ② Accident type (fire, collapse, electric shock, explosion, leakage, mechanical injury, etc.); ③ Preliminary assessment of casualties and direct economic losses of the accident; ④ Nature and quantity of hazardous materials involved in the accident; ⑤ Accident development trend, possible impact scope, on-site personnel and nearby population distribution; ⑥ Preliminary cause judgment of the accident; ⑦ Emergency rescue measures taken; ⑧ Matters requiring the assistance of relevant departments and units in rescue and rescue; ⑨ Reporting time, reporting unit, reporter and telephone contact information of the accident.

Self inspection 19 8.

Termination of emergency rescue plan and aftermath 18 8.

According to the characteristics of the project and the actual situation of construction technology, the work flow of emergency plan has carefully organized the identification and evaluation of hazard sources and environmental factors, specially formulated emergency measures for emergencies or accidents of the project, carried out emergency knowledge education and emergency drill, and improved the emergency ability of on-site operators, Reduce the damage and adverse environmental impact caused by emergencies.

1 flow chart of emergency plan ^ 3.

Other relevant departments shall do a good job in rescue cooperation.

emergency measures 81.

At the same time, call 120 for medical assistance.

preventive measures 61.

The security department shall strengthen the security, public security management and traffic diversion at the accident site, prevent and stop all kinds of destructive activities, maintain social security, and take monitoring measures for the perpetrators and other relevant personnel to prevent escape.

Measures to prevent traffic accidents 6 IV.

Handling procedures for public security and safety accidents during festivals 16 7.

Hazard source analysis according to the construction characteristics and complex geological conditions of the project, taking full account of the construction technical difficulties, difficulties and adverse conditions, through multi-party discussion and analysis, it is determined that the emergencies, risks or emergencies of the project are as follows: the main safety precautions for pipe jacking crossing are: pavement settlement during construction Collapse accident, underground pipeline damage, electric shock accident, falling from height, object strike, mechanical injury, lifting injury, traffic accident, etc.

Emergency plan for accidents 111.

Team members: organize the rescue team to carry out on-site emergency rescue, timely feed back the dangerous situation to the team leader or deputy team leader, and implement the instructions of the team leader or deputy team leader for rescue.

4.

The proposed pipeline has a length of 2400m and a pipe diameter of 1400mm.

Equipment emergency measures 95 Emergency measures for pipe jacking 105.

2) After the safety accident emergency rescue plan is launched, the emergency rescue team shall be put into operation immediately.

on site accident disposal command organization 19 safety emergency plan I.

Emergency measures for pipe jacking pit 82.

Emergency rescue equipment and facilities Equipment 19 IX.

Communication and information support 182.

Emergency response 5 III.

Measures to prevent pipeline damage 63.

accident site protection: after the occurrence of major safety accidents, the accident site and relevant units must strictly protect the accident site, and quickly take necessary measures to rescue personnel and property.

Fig.

The material department, mechanical and electrical team and other departments shall restore the damaged roads, water, electricity, communication and other relevant facilities as soon as possible to ensure the smooth development of emergency rescue work.

Restore and ensure the normal progress of production.

2.

project overview daguantang water plant phase I transmission and distribution pipeline lot III project is located on the East-West side of Jinzhai South Road, Feixi County, Hefei City, with a near East-West trend.

2、 Emergency plan preparation and hazard source analysis 1.

Emergency support 183.

Most of them are grooved construction, and the buried depth of the pipeline is between 2M and 4m; Local sections are pipe jacking construction, and the buried depth of the pipeline is below 6.0m.

Measures to prevent road subsidence and collapse 62.

Supervision and inspection 195.

Emergency measures for road subsidence 83.

Emergency measures for road subsidence 84.

Emergency resources the preparation of emergency resources is an important guarantee for emergency rescue work.

6) .

When it is necessary to move on-site objects due to rescuing the wounded, preventing the expansion of the accident and dredging traffic, signs, photos, detailed records and drawing of the accident site map must be made, and important traces and physical evidence on the site must be properly preserved.

after the accident, rescue the injured at the first time, which is the top priority of rescue.

Emergency plan for mechanical pipe jacking March 2020 catalogue I.

4) .

In the absence of the team leader, drive the team leader’s rights, coordinate and deal with relevant work, and be specifically responsible for the on-site management of production safety in each division area.

Emergency plan for work safety accidents 112.

Pipe jacking construction: when crossing the intersection of Jinzhai South Road and daguanhu Road, the mechanical pipe jacking construction method is used to lay the casing.

The casing adopts DN1600 and the interface is welded.

Rescue team: carry out on-site rescue operations.

1) In the early stage of the accident, the personnel on the accident site shall actively take emergency self rescue measures, start the emergency rescue plan on the construction site, and implement on-site rescue to prevent the expansion of the accident.

Deputy team leader: assist the team leader in his work.