[recruitment] bridge construction personnel

If contracted, it is calculated according to the total length of bridge construction, 20-28 / m.

We are entrusted to find the bridge construction personnel.

If you are interested, please contact directly.

Please contact the interested friends directly.

Lifting Anchor

It is required to have a work at height certificate, a 100mm * 100mm bridge of about 700m, a construction height of 7m, and a climbing car and scaffold.

Due to the development of the company, the company has several bridge projects.

Learning recommendation: VIP technical exchange group: click my weak current scheme and quotation: click my weak current drawings: click me..

Treatment: it can be contracted or calculated according to the point work, which is 350-450 / day.

Qian needs relevant work experience.

Location: Rugao, Nantong, Jiangsu Tel: 18913107380 Mr.

It needs 2-4 people, at least 2 people.

Position 1: bridge construction personnel job responsibilities: there are weak current engineering projects, and bridge construction personnel need to be found.

At the end of December, there was Qian Zong in the weak current VIP technology group.