The northwest wind will be affected by the strong cold air from the night of the 16th to the 17th.
The relevant matters are hereby notified as follows: 1 The unit user shall present the unit business license (organization code card) and the buyer’s ID card to buy bottled liquefied petroleum gas, and individual resident users buy bottled liquefied petroleum gas with their own ID card.
Kunshan Lumeng children’s rehabilitation center, a forward-looking project of people’s livelihood projects in 2022, will start construction to create an effect picture of a first-class children’s rehabilitation center.
II.
It is one of the main traffic trunk roads in the east-west direction of Kunshan.
“After the Kunshan Lumeng children’s rehabilitation center is completed and put into operation, it can treat 600 disabled children at the same time.
As one of the important nodes of the channel regulation project of Qingyang port, the Central South line will be started at 10:00 on December 15 (kongxiang bridge) Wanjia road tulip section will be fully closed △ notice of closed road construction △ closed construction area in order to facilitate citizens’ travel, the entrance of Wanjia Road, the original central main line, will become an exit.
Guys, is it a little “cold hands and feet” to go to work in the morning this week? According to the latest weather report, the north of the river is basically below the zero line, According to the latest release of Kunshan meteorology, it is expected that there will be a rainfall process in Kunshan from the 15th to the 16th in the next week, and the rest of the time will be dominated by fine weather.
Yesterday, Kunshan, China announced the change of the commercial housing planning scheme on the north side of Zhonghua Park West Road and the east side of Xincheng South Road.
Quickly send it to your circle ~ source: Suzhou release, Kunshan meteorology and other Kunshan windows.
Kunshan Lumeng children’s rehabilitation center project is located in the Municipal rehabilitation hospital, with a construction area of about 20000 square meters and can serve 600 disabled children, with a total investment of about 200 million yuan, It is planned to start construction in mid-2022.
In terms of temperature: the temperature rises in the early stage of this week, the temperature will drop significantly from the 16th, and the minimum temperature drop range can reach 9 ~ 11 ℃.
It is east-west, with a deck width of 25.5m, divided into two parts.
04 notice! Real name sales! Circular on the implementation of the real name system for the sale of bottled liquefied petroleum gas (snawb [2021] No.
03 a new commercial and hotel project was added in the south of the city.
After the change, the total construction area was 25441.00 square meters.
At present, the project is at the stage of scheme design.
The office of Suzhou urban gas safety production professional committee is full of important news on December 9, 2021.
From east to west, vehicles will drive out of the main line from the exit of tulip road.
At present, because the navigation hole clearance at the bridge site of kongxiang bridge does not meet the class III navigation requirements, the construction scheme of in-situ demolition and reconstruction is adopted, and the navigation clearance is 60 × 7m, and the maximum design navigable water level is 2.15m.
The lowest temperature in a week is 0 ~ 1 ℃, which will appear in the morning of the 18th ↓ except for the weather, There are also these hot information about transportation, school education, life and leisure this week.
III Bottled liquefied petroleum gas enterprises that fail to fulfill the real name system to sell bottled liquefied petroleum gas will be listed as key targets for rectification and ordered to make rectification; Those who refuse to rectify or fail to rectify in place will be investigated and dealt with according to law.
It will become the largest and most complete children’s rehabilitation center in the province.” On December 9, Zhang Cong, President of the municipal rehabilitation hospital, said that after the construction of Lumeng children’s rehabilitation center, the original children’s rehabilitation treatment group will move in as a whole to carry out all kinds of rehabilitation treatment, so that more disabled children can better return to life and school.
Without authorization, the content of this article shall not be used on any platform.
49) in order to strengthen the safety management of the sale of bottled liquefied petroleum gas and ensure the safety of people’s lives and property, according to the relevant provisions of the work safety law of the people’s Republic of China, the regulations on the administration of urban gas and the regulations on the administration of gas in Jiangsu Province, it is decided that as of the date of promulgation of this circular, The city’s bottled liquefied petroleum gas is sold under the real name system.
Kongxiang bridge was built in 2001 and has now been included in the urban expressway of the south line of Kunshan central ring road.
From west to East, vehicles will drive out of the main line from the level crossing of Wanjia road.
With an investment of 200 million yuan, Kunshan children’s rehabilitation center will start work next year.
It is preferred to stamp this immediately: 93 yuan for 100 yuan for mobile phone calls! Customer service wechat of China Mobile, China Telecom and China Unicom: 18006268000 business cooperation: 18012662666 stamp the original text and join the welfare group of Kunshan forum with one click..
Click to enter Kunshan forum.
The main planned commercial and hotel functions of the project were constructed by Kunshan industrial high and new technology development Investment Co., Ltd.
When selling and distributing bottled liquefied petroleum gas, each bottled liquefied petroleum gas business enterprise and service station shall strictly do a good job in the real name registration of sales, and the gas purchasing users shall actively cooperate to make the sales traceable.
Watch the latest! 01 closed construction, The construction period is 2 years.
Violators will be prosecuted.
Vehicles will drive into the main line from west to East Vehicles driving out of the main line at the original entrance of Wanjia road drive into the main line from the original exit of Wanjia road and guide vehicles to leave the main line # project overview # △ effect drawing of the new bridge of kongxiang bridge.
Due to the expansion of urban expressway, the north and south sides of kongxiang bridge are new G312 national highway bridges.
The exit of Wanjia Road, the original central main line, will become an entrance.
It is hereby notified.