These are the original documents of engineering claims, which should be kept by category to create opportunities for claims.
The claim directly involves the vital economic interests of both parties.
2) Relevant data shall be collected before the commencement of the project, including the traffic conditions of the project site, three supplies and one leveling, and whether the water supply and power supply meet the construction needs? Does the price of water and electricity exceed the budget price? Height of groundwater level, soil condition, whether there are obstacles, etc.
The claim is directly related to the vital interests of the owner.
The above matters are sufficient reasons for making claims and can not be let go easily.
4) In the joint review of drawings, the minutes of joint review of construction drawings shall be carefully prepared, because the minutes of joint review of construction drawings are an important component of the construction contract and an important basis for claims.
And specify the policies, basis and methods for additional adjustment of contract price and claim, so as to provide contract basis and legal guarantee for adjustment of project cost and claim during completion settlement.
In particular, for some concealed works, excavation works and demolition works, we must apply for the visa in time, otherwise the situation will easily lead to wrangling and increase the difficulty of claims.
It can’t rely on rhetoric, nonsense, or improper means.
12) We should be very familiar with the visa time requirements for various claims, and distinguish the specific meaning of the time concepts of 24 hours, 18 hours, 7 days, 14 days and 28 days.
Only when they are reasonable can they go everywhere, only when they have evidence can they work properly, and only when they are on time can they not become invalid.
1) the claim must be recognized by the supervisor.
1) it shall be considered as carefully as possible, the wording shall be rigorous, and the rights and obligations shall be clear, so as to achieve equality and mutual benefit.
9) The visa procedures for design change, technical verification, increase and decrease of quantities shall be complete to ensure the integrity of data; Temporary changes, oral instructions, meeting research, correspondence, etc.
The contract price shall preferably be adjustable.
3、 Correctly handle the relationship between the owner and the supervisor.
In addition, in case of industrial injury and mechanical accident during construction, the actual situation of the site shall also be recorded in time to distinguish responsibilities; For idle personnel and equipment, delay in construction period and damage to the project, visa procedures shall be handled in time.
The ancients said: people do not stand without faith, things do not succeed without faith, and industries do not prosper without faith.
2、 Carefully sign the construction contract with the employer.
3) Organize professional technicians to carefully study the construction drawings, communicate with each other, and find out the omissions, errors, unknown, unknown, inconsistent with reality, conflicts between disciplines and so on.
What skills are needed when making claims? > > 1、 Do a good job in collecting and sorting out visas.
The key is to carefully collect and sort it out, supplemented by corresponding laws, regulations and contract terms, so as to truly become the basis for successful claims.
13) Do not forget, do not leak, do not lack, many, and be diligent in eyes, hands, mouth and legs.
7) During the construction process, the Contractor shall adhere to the written instructions of the supervisor and the owner.
of the owner or the supervisor shall be collected in time and sorted into words.
We should not neglect the written record because of the oral commitment of the supervisor, nor relax the visa because everyone knows.
2) Based on the concept of honesty and ethics, improve the enterprise’s internal management system and quality assurance system, provide honest services, ensure project quality, establish brand awareness, strengthen management, and win good reputation in the eyes of the owner and supervisor.
The supervisor plays a key role in the success of the claim.
A specially assigned person shall record every day and ask the on-site supervision engineer to sign; In case of on-site loss, on-site camera and video recording shall also be done to achieve the integrity of data; Detailed records shall be made for water cut-off, power failure, mobilization time, quantity, quality, etc.
10) Materials designated or approved by Party A or new materials, The actual price is higher than the budget price (or bid price), if it is allowed to make up the difference according to the actual situation according to the provisions of the contract, the price certification formalities shall be handled in time.
8) Make construction logs, technical data and other construction records.
These facts and evidence can only come from all links in the whole process of project contracting.
The Contractor shall express understanding and sympathy for the owner’s or the supervisor’s fault and exchange good faith for the other party’s trust and understanding..
11) if it is necessary to change the design or construction scheme during construction, it shall also be done in time Modify and supplement visas.
If necessary, the construction process can also be photographed or videotaped.
of materials supplied by Party A.
The basis of successful claim lies in sufficient facts and conclusive evidence.
During the construction process, we often encounter some situations that require claims.
Therefore, we should correctly handle the relationship between the owner and the supervisor and establish a good reputation in practical work.
Integrity is the cornerstone of the development of the whole society.
6) The owner requires to change the local size and quantity of the construction project, adjust the construction materials, change the construction technology, etc., and the water and power cuts exceed the time limit specified in the original contract; The construction is delayed due to the requirements of the construction unit or the supervision unit, resulting in project rework, slowdown, increase of quantities, etc.
For example, the construction site is orderly and tidy; The project manager shall carry out and stop as soon as there is an order.
Therefore, the collection, sorting and visa of claim data must be done in time in the whole process of construction.
If new materials, new processes and new technologies are used for construction and there is no corresponding budget quota pricing, relevant cost information shall be collected or opinions of relevant cost departments shall be consulted to prepare the basis for settlement.
In short, we should improve mutual relations, maintain an atmosphere of friendship and cooperation and trust each other.
The success or failure of the Contractor’s claim depends on the owner’s attitude to a great extent.
Even if it is necessary to implement its oral orders under special circumstances, it shall immediately require it to confirm in written documents or write to the supervisor and the owner for confirmation.
5) Predictive analysis shall be conducted in time during construction to find the divisional and subdivisional works that may cause claims, such as disastrous climate, underground obstacles, soft foundation or cultural relics; And external environmental impacts such as land acquisition, demolition and construction conditions.