This construction is the last battle of the section in 2021.
I.
The construction of replacing wide sleepers in Baoji south station was successfully completed.
Photo: Zhang Xin copywriter: Zhao Chunmei editor: Wang Chao reviewed by: Zhang baohu issued by: Tian Haitao xiangaotie scanning QR code | pay attention to our Xi’an high speed railway infrastructure section financial media studio..
II.
Actively carry out the theme practice activity of “red front-line party flag, tackling difficulties and being the pioneer”, mobilize Party organizations and Party members at all levels, pool strong joint forces, give play to strong combat effectiveness, steadily promote the construction, and lay the foundation for the punctual opening.
Since its commencement, the section Party committee and the section have actively implemented the decision-making and deployment of the Party committee and the group company of the group company and spared no effort to carry out various construction.
On December 28, 2021, with the ballast car slowly passing through the track, it marked that the construction of replacing wide sleepers in Baoji south station was officially completed after 20 days of hard work.
Third, do a good job in logistics support.
Each track of Baoji South Railway Station was successfully opened, laying the foundation for the safety of Spring Festival transportation, and making a contribution to the high-speed rail people for the group company to win the key goal of “two persistence and two realization”.
strictly control safety and quality, attach great importance to safety and quality management, adhere to the level by level responsibility system and the system of special person for special post monitoring and control, strictly control the safety risk gate, and escort the smooth construction.
Based on reality, arrange special personnel to be responsible for thermal insulation supplies, daily necessities, daily meals, materials and tools, epidemic prevention and control, accurately meet the needs of employees, form and improve the logistics support system, and solve the worries of employees.
Pay close attention to the construction progress, implement efficient organization, formulate scientific construction and production plan, and make overall coordination and reasonable investment of various resources according to the actual needs of the site to ensure the efficient promotion of construction.