Note to new owners: hydropower construction should pay attention to these details, which will not be a problem in 70 years

Please rest assured to follow.

Before construction: precautions for point reservation details: ① more points are better than less.

There will be updates every day.

This article is transferred from the network, and the copyright belongs to the originator.

U Bar Anchor

What are the advantages and disadvantages of hydropower? 2.

It’s no problem to live for 70 years! 1.

② Determine the position and height according to the size of household appliances / furniture.

We must pay attention to the details of hydropower transformation.

Water and electricity slotting depth < 3.5cm3 No transverse slotting (transverse slotting) 4 The line shall be well protected 5 Be horizontal and vertical to reduce random wiring..

The two cases should be considered separately: 1 Decoration company responsible for decoration 2 Self decoration 2 Before construction: brand selection of hydropower pipeline 1 Brand above medium 2 Staring at the water and electricity pipeline laying of the decoration company 3 During construction: pay attention to these matters 1 Whether to go to the top or to the ground should be considered in advance.

Before reading this article, please click the blue font above, and then click “follow”, so that you can receive our latest content for free.

If there is infringement, please contact us to delete.

It is a free subscription.