Key points of construction contract review, these “pits” should be paid attention to!
There are specific provisions in the general terms, and the acceptance requirements of “positive and negative zero, capping” and other main nodes can also be...
scaffolding
There are specific provisions in the general terms, and the acceptance requirements of “positive and negative zero, capping” and other main nodes can also be...
If you have any doubt, you can call the bus service hotline 0359-2128311. 6, No. 6, No. 9 and No. From April 17 to July...
4.13 the Ministry of ecological environment announced the second batch of typical cases of ecological environment law enforcement video source: CCTV network 4.14 the second...
The safety of the site is not enough. Lifting Anchor Many sections have entered the stage of railway sleeper and track laying. Recently, the construction...
Composite geomembrane is widely used in canal anti-seepage engineering. With the increase of density, the mechanical properties and barrier properties will be improved accordingly, and...
600 represents pile diameter 600mm. It is strictly prohibited to smash with a sledgehammer. Pile sinking: press the pile into the specified design bottom elevation....
If 1860 yuan / m2 agreed in the contract is still used as the pricing unit price of the completed project price, it is obviously...
The joint width of reserved joint pavement shall be in accordance with the design requirements. 4. Sample setting: in principle, stones with high color saturation...
88 , due to the impact of the closure construction of yaosiam canal bridge at the South Gate of Yudu market, No. 9 and No....
Seepage prevention of reservoirs, reservoirs, drinking water tanks, and other systems. Oil storage tank, oil well sludge tank, chemical reaction tank and sedimentation tank of...