From today on, the two sections of Jimo road will be closed for construction! Please detour in advance!
We all know.. It is hereby notified. Inform the third Tianshan Road (Lanao road to the first wuguhe Road) in Jimo District of Qingdao to...
scaffolding
We all know.. It is hereby notified. Inform the third Tianshan Road (Lanao road to the first wuguhe Road) in Jimo District of Qingdao to...
The construction progress broadcast group of Zhenlong house has been established. Cast In Loop Hello, neighbors ~ today Xiaobian came to the project site of...
Enclosure mode: break off the whole scene. According to the requirements of the district government and the construction needs of the reconstruction project of Niuwei...
Phase 1 [closure time] from March 3, 2022 to March 7, 2022 (9:00-16:00) [closed section] during the closure construction period of the main lane from...
1.2 the surface plastering gypsum is mixed with an appropriate amount of admixture, which is used for the bottom plastering gypsum or other thin-layer leveling...
QQ group 925078799, password? How to improve the level of project cost audit? Do you make the difference between the four grades of project manager...
The station adopts the underground three-layer stacked side platform, which is 118m long and 4.5m wide. The main structure has been completed. The station is...
Operators, machinery and equipment transferred to the site, utilization, start and end time, etc., to provide basis for cost accounting. If there is infringement, please...
Effective drainage system shall be set for foundation pit construction; 5. (2) Erection of derrick and gantry 1. The installation and disassembly personnel of each...
(2) Machinery and equipment: grinding wheel cutting machine, electric welding machine, air compressor, electric hammer. 2. The width of waterstop shall not be less than...