Application for hot work permit at construction site (template)
Acquisition method 2: Click. Spherical Head Anchor Text ▼▲ data acquisition method original document acquisition method 1: share this article to the building complex (no...
scaffolding
Acquisition method 2: Click. Spherical Head Anchor Text ▼▲ data acquisition method original document acquisition method 1: share this article to the building complex (no...
Precautions during traffic control, please wait patiently for passing vehicles and pedestrians and obey the command of on-site traffic management personnel. Please understand the inconvenience...
Jinwu (hang) plot 2021-012, located in the main urban area of Yang village, Wuqing, is the core residential plot in the old urban area launched...
The scope of the red line is less, and a large section is left in the north. The setting out hole was left wrong, and...
3、 Construction process flow 1. The spacing of split screws in the middle of the beam is 400mm ~ 500mm. The elevation of the upper...
The upper and lower reinforcement of the bottom plate shall be arranged according to the principle that the stressed reinforcement is outside. 3. 3. Cushion...
Including the above complex symbols and codes, after all, this is also the threshold of the interview company! 1、 Complete collection of graphic symbols for...
4. address: No. 111, Tianchang Road, high tech Zone, Chengdu to obtain the comparison documents from 9:00 a.m. 2. on November 12, 2021 (Beijing time,...
The materials of engineering practice reference are construction projects), Save all with one click at any time. Click me: the latest practical series of high-quality...
Construction process flow chart of percussion drill bored pile I construction preparation · site leveling (1) three supplies and one leveling shall be completed before...