Construction technology of fabricated Engineering – installation process of ALC partition board
2) the pressure groove treatment at the connection between the inner wall plate and the structure is convenient to hang the net and prevent cracking....
scaffolding
2) the pressure groove treatment at the connection between the inner wall plate and the structure is convenient to hang the net and prevent cracking....
Generally speaking, the size of the range of water collecting wells largely depends on the actual water output of the pump. It should be noted,...
At that time, the traffic capacity of this section will be greatly reduced. Click 「 below 」. The figure shows the detour lines from south...
The temperature, depth and breadth are waiting for you to pay attention to ▼ ABC safety loss prevention link – Emergency grand view training grand...
2. In case of failure of electrical lines, devices and electric tools on the equipment, they shall be handed over to the electrician for...
Share every day. It’s a free subscription. Please rest assured. Note: This article. Before reading this article, please click the blue font above, and...
Share it with more family and neighbors!.. Solid Lifting Socket Cross Pin
You can master Tengzhou anytime, anywhere!.. Column Clamps Formwork After research and decision by the company, our company will no longer accept opening, construction and...
A vibrating opening shall be reserved for the step cover plate; 3. The pin hole spacing of wall formwork is 300mm, and both ends are...
The specific detour conditions are as follows (the detour schematic diagram is attached): No. The departure direction of Dongfeng station is adjusted as follows: Dongfeng...