Construction method: non perforated formwork erection and reinforcement of frame column
In the final disclaimer: the materials of this official account are all from network collection. If it infringes your rights and interests, please contact us...
scaffolding
In the final disclaimer: the materials of this official account are all from network collection. If it infringes your rights and interests, please contact us...
In our opinion, at the stage of prosecution and acceptance of civil cases, the people’s court can determine the corresponding cause of action according to...
Collapse is caused by incorrect construction methods, incorrect excavation procedures, over elevation excavation, incorrect support setting or removal (construction is not carried out according to...
However, if the bankrupt contractor cannot claim, the actual constructor cannot claim, and the right of price priority is dead in name. Key words: the...
In order to ensure the safety of citizens’ travel and ensure the smooth implementation of the project, the construction arrangements and related matters are hereby...
The bridge tower is constructed by hydraulic climbing formwork method. The mid span steel beams shall be installed in sections with single cantilever of large...
(2) Ships passing by shall strengthen lookout and pass at a safe speed to ensure safety. Concern about Food Safety, Care for Life and Health...
Mixing pile process: prepare cement → put pile driver in place → drill hole (add water while drilling and put cement powder for mixing) →...
Liao said that it was suggested that relevant departments should install more warning signs around the construction section to guide vehicles to bypass. Elephant Foot...
(2) Criteria for excellence level: 1) The inspection results of the main control items should all meet the requirements of SL632-2012. Erection Anchor 2. (2)...