The construction mistakes we made in those years…
The scope of the red line is less, and a large section is left in the north. The setting out hole was left wrong, and...
The scope of the red line is less, and a large section is left in the north. The setting out hole was left wrong, and...
3、 Construction process flow 1. The spacing of split screws in the middle of the beam is 400mm ~ 500mm. The elevation of the upper...
The upper and lower reinforcement of the bottom plate shall be arranged according to the principle that the stressed reinforcement is outside. 3. 3. Cushion...
Including the above complex symbols and codes, after all, this is also the threshold of the interview company! 1、 Complete collection of graphic symbols for...
4. address: No. 111, Tianchang Road, high tech Zone, Chengdu to obtain the comparison documents from 9:00 a.m. 2. on November 12, 2021 (Beijing time,...
The materials of engineering practice reference are construction projects), Save all with one click at any time. Click me: the latest practical series of high-quality...
Construction process flow chart of percussion drill bored pile I construction preparation · site leveling (1) three supplies and one leveling shall be completed before...
Disclaimer Disclaimer: the official account information of WeChat is from the network.. Corn Magnetic Box
Fortunately, all personnel were transferred safely, which did not cause casualties. (source: integrated on the Internet, the picture and copyright belong to the original author....
Bend Loop They need to stop production and business for rectification, revoke the qualification certificate, confiscate the illegal income, distinguish the amount of illegal income,...