Latest announcement! Closed construction!
Due to the need of heating maintenance and construction of the single tunnel on the north side of shikwai West tunnel (the westbound direction of...
Due to the need of heating maintenance and construction of the single tunnel on the north side of shikwai West tunnel (the westbound direction of...
Some students Tucao saw this picture as if they could make complaints about the thick dust and dirt. Ring Clutch Students said that decoration would...
For some reasons, it will be adjusted to September 26 to September 29 (22:30 at night to 6:00 the next day). During the construction period,...
The closure time is from 0:00 on September 28 to 0:00 on November 30, 2021 (the construction period will be postponed in case of design...
Fixing Socket Angular End Source: if there is infringement on the network, please contact to delete the information sharing, and the bottom is free.
Lifting Anchor Along the way, the main works such as Dashan bridge, diaoshuiyan bridge, Caojiagou bridge, yangjiachongzi bridge and Wanzi No. Photo by Li Xueyou:...
Detour scheme: vehicles from east to north of Beijing route and north to west of Binhe route can bypass liuqinghe East Road, Renhe Road Shunhe...
The sidewalks on both sides are equipped with hanging plates on the outside, and the communication cables are embedded to cross the Luohe River. U60...
According to the project arrangement of speed-up reconstruction (North line) of the municipal Ring Road, the construction of Fukang Avenue (Dongfeng Automobile avenue to Yangliu...
The competent department compares the basic information of the verification object and whether the main personnel meet the relevant standards through the official websites such...