Commercial air conditioning design and Construction Application Manual
It is recommended not to exceed 100% when starting up at the same time or high utilization rate at the same time; It is recommended...
It is recommended not to exceed 100% when starting up at the same time or high utilization rate at the same time; It is recommended...
The calculation of earthwork is generally carried out according to the design topographic map with the original topographic contour. The landscape effect and technical requirements...
As a change management, a complete and strict set of regulations shall be formulated in the early stage of the project Close change process to...
The text ▼ of the special construction scheme for tower crane foundation has not been uploaded, and it is not the full text ▲ data...
It is hereby announced. Please click the blue word above to see more! Announcement on delay of closure construction of Chifeng East toll...
The project is planned to start at 23:00 on September 17, 2021 and complete by the end of December 2022, with a total construction period...
The Ziwei Yunjing time EPC project is located in the “future pupil” of the core plate of the central Innovation Zone of Xi’an high tech...
▼▼▼ notice on temporary adjustment of the prohibition of left turning of motor vehicles at some intersections of Kaiyue road. Retirees of former enterprises who...
When the trunking is installed vertically in layers, the cables shall be arranged from top to bottom according to the following specified sequence: instrument signal...
Short Waved Anchor Each gear is painted with red and white warning paint, and a 250mm high safety warning placard is set in the middle,...