UCD project | shield tunnel construction of Shaoxing Metro Line 1 project has been completed
At the same time, the shield also needs to pass through the upper soft and lower hard composite stratum, so the construction is difficult ....
At the same time, the shield also needs to pass through the upper soft and lower hard composite stratum, so the construction is difficult ....
Flat End Socket Transfer from: PPP project dispute settlement “construction site New Coronavirus pneumonia epidemic prevention and control management regulations” work link 15818721800121378385@qq.com .
In this case, Wang Gang and Hua’an company did not sign a written affiliation agreement or borrowing qualification agreement, and Hua’an company claimed that its...
Original title: Beijing realizes inter provincial and non local electronic tax payment source: China tax report date: August 4, 2021 Edition: 01 Author: Zhang Jing...
Notice on the semi closed construction of the upgrading and reconstruction project of Yaojie west section of g206 Yantai Shantou line the upgrading and reconstruction...
Construction technology of superstructure of main bridge of Cuijiaying Hanjiang super large bridge of Han Shi high speed railway Zhou Gongjian 1,2 (1 . Plastic...
If there are 7-8m cantilevers in areas with good soil quality, it can be used in soft soil areas with a pit depth of no...
If it is found that the epidemic prevention and control is not in place, it shall be ordered to rectify immediately; If the circumstances are...
The putty layer shall be constructed in L one time: the bottom layer mainly plays the role of preliminary leveling . The surface treatment of...
and Shanghai Zhenghai Real Estate Development Co., Ltd . In this case, the essence is that the employer forms a de facto construction contract relationship...